Prepare Yourself
This section illustrates how to prepare yourself before removing the chassis from the sealed antistatic bag.
The figures show how to cuff the ESD strap around the wrist and the ground cord that connects the cuff to
the ground. ESD wrist straps are the primary means of controlling static charge on personnel.
Figure 3: Wearing the ESD Strap
Prepare Rack for Chassis Installation
Install the Cisco 8800 Series Routers on a standard 19 inch, Electronic Industries Alliance (EIA) rack with
mounting rails that conform to English universal hole spacing according to Section 1 of the
ANSI/EIA-310-D-1992 standard.
The spacing between the posts of the rack must be (EIA-310-D-1992 19-inch rack compatible) wide enough
to accommodate the width of the chassis.
Before you move the chassis or mount the chassis into the rack, we recommend that you do the following:
Hardware Installation Guide for Cisco 8800 Series Routers
20
Prepare for Installation
Prepare Yourself
Содержание 8800 Series
Страница 6: ...Hardware Installation Guide for Cisco 8800 Series Routers vi Contents ...
Страница 30: ...Hardware Installation Guide for Cisco 8800 Series Routers 24 Unpack and Install the Chassis Unpack the Chassis ...
Страница 112: ...Hardware Installation Guide for Cisco 8800 Series Routers 106 LEDs Line Card LEDs ...