15
Instruction Manual
RECmax-CVM
3�4�2�- MEASUREMENT OF THREE-PHASE NETWORK: RECmax-CVM 4-POLE
Brown/Green
Grey/Pink
Green/White
Red/Blue
L1
L2
L3
N
3P1
2P1
1P1
3P2
2P2
1P2
IL1
(19)
IL2
(20)
IL3
(21)
C
(22)
I∆
(1)
I∆
(2)
Figure 7: Measurement of three-phase network: RECmax-CVM 4-poles�
All active conductors that feed the load to be protected, including the neutral, must
pass through the internal diameter of the earth leakage transformer� Do not pass the
protective conductor or the earth wire�
The current measurement transformer must be installed on the top of the circuit
breaker�
Содержание RECmax-CVM 2-pole
Страница 2: ...2 RECmax CVM Instruction Manual...
Страница 13: ...13 Instruction Manual RECmax CVM 9 10 11 13 14 15 3 4 5 7 8 Figure 5 RECmax CVM terminals lower face...
Страница 65: ...65 Instruction Manual RECmax CVM 11 CE CERTIFICATE...
Страница 66: ...66 RECmax CVM Instruction Manual...
Страница 67: ...67 Instruction Manual RECmax CVM...