47
Instruction Manual
line-CVM-D32
ARON,
Three-phase mains measuring with 3-wire connection and transformers with ARON connec-
tion.
To validate the option, hold down key
.
Use key
to skip to the next programming point.
6�1�5�- CALCULATION PERIODS
This screen enables configuration of device calculation periods.
SETUP
AGGREGATION PERIOD
15
PD PERIOD
min
15
min
MEASURE
Hold down key
to set the
aggregation period,
i.e. measurement integration period
(AGGREGATION
PERIOD)
.
Hold down key
to set the
integration period
for maximum demand calculation
(PD PERIOD)
.
Use keys
and
to modify the digit's value.
Press key
to skip through the digits.
Hold down key
to validate the value.
Aggregation period:
Minimum value:
1 minute.
Maximum value:
60 minutes.
Note:
The programmed value must be divisible by 60, i.e. the division
60 / Aggregation period
must
be exact.
Maximum demand integration period:
Minimum value:
1 minute.
Maximum value:
60 minutes.
Use key
to skip to the next programming point.