Configuration values
Table 25:Configuration values: Type of installation�
Type of installation
Possible values
4-3Ph
Three-phase network measurement with a 4-wire connection.
3-3Ph
Three-phase network measurement with a 3-wire connection.
3-AroN
Three-phase network measurement with a 3-wire connection and
transformers with an ARON connection.
3-2Ph
Two-phase network measurement with a 3-wire connection.
2-2Ph
Single-phase network measurement, phase to phase, with a 2-wire
connection.
2-1Ph
Single-phase network measurement, phase to neutral, with a 2-wire
connection.
Press key
to access the next programming step.
6�10�- TYPE OF INTEGRATION OF THE MAXIMUM DEMAND
In this screen, the type of integration to be used for the calculation of the maximum demand is
selected. See
�
Press key
for 3 seconds to edit the value. The
icon appears at the top of the screen.
The key
jumps between the possible options.
To validate the data, press
for 3 seconds and the
icon will disappear from the display.
Configuration values
Table 26:Configuration values:
Type of integration of the maximum demand�
Type of integration of the maximum demand
Possible values
SIid
e
Sliding window
ti
me
d
Fixed window
Note:
When modifying the type of integration, the device restarts the calculation of the maximum
demand.
Press key
to access the next programming step.
44
CVM-C11
Instruction Manual
Содержание CVM-C11
Страница 1: ...INSTRUCTION MANUAL M361B01 03 22A Power analyzer CVM C11...
Страница 2: ...2 CVM C11 Instruction Manual...
Страница 94: ...11 EU DECLARATION OF CONFORMITY 94 CVM C11 Instruction Manual...
Страница 95: ...95 Instruction Manual CVM C11...
Страница 96: ...96 CVM C11 Instruction Manual...