background image

Assembly Instructions 

Use of a PST (Manual Pre Setting Tool) is 

recommended

GYROLOK

®

 Marking Tool (GMT)

 

is strongly recommended

.

Fully insert a correctly cut, deburred 
tube into the PST or fitting body 
until the tube rests on the sizing 
angle. 

Holding the tube in the PST or 
Body, extract the nut and 
ferrules to visually ensure both 
ferrules are correctly oriented. 

Once correct ferrule orientation 
is confirmed, thread & rotate the nut 
onto the PST or Body until hand-
tight. The GMT witness line should 

NOT

 be visible. 

Establish a reference point for 
wrench tightening by marking both 
the fitting body and nut.  

 

While supporting the PST or fitting 
body, tighten the nut with a wrench 
1¼ turns. The pre-set or make-up is 
now complete. Confirm that the GMT 
witness line is now visible.

(GMT Line)

(GMT Line)

GYROLOK

®

 Marking Tool (GMT) 

is strongly recommended

.

Ensure the HPST Tooling Set is installed with the proper indicator nut. 

Insert the correctly cut and 
deburred tube into the GMT as far 
as possible.

 

Mark the tubing as shown with an
Ultra-Fine Point, Chloride-Free 
pen (recommended Sharpie Model 
37001). Take care to position the 
marker perpendicular to the GMT, or 
insufficient ferrule set could occur.

Fully insert a correctly cut, 
deburred tube into the HPST 
head. Visually ensure both ferrules 
are correctly oriented. Thread & 
rotate the nut until hand-tight. 

Set the indicator arm in the 
operating position by rotating the 
Indicator Nut counter-clockwise 
until it stops.

   

Pump the handle until the 
indicator arm releases. 

CAUTION:

 Stop pumping 

immediately after the arm 
releases, as over-pumping may 
cause the tube to swell and stick. 
Pre-setting is now complete. 

Insert the end with pre-set ferrules 
and nut into the fitting. Thread 
and rotate the nut until hand-tight. 
While supporting the fitting body, 
tighten the nut with a wrench 

1

/

turn for tubing up to 1” (25mm). 
For tubing greater than 1” (25mm) 

3

/

turn is required. The initial 

fitting make-up is now complete.

Firmly insert end with the correctly 
set ferrules & nut into the fitting. 
Thread & rotate the nut until 
hand-tight. The GMT witness line 
should 

NOT

 be visible. 

While supporting the fitting 
body, tighten the nut with a 
wrench ¼ turn.

Manual Assembly Instructions

HPST Assembly Instructions

GYROLOK

®

 MARKING TOOL (GMT) INSTRUCTIONS

REMAKE INSTRUCTIONS

0-1/2” (12mm)

MANUAL ASSEMBLY

½” – 1” (12mm-25mm)

MANUAL OR HPST ASSEMBLY

based on installation conditions

Above 1” (25mm) 

HPST ASSEMBLY REQUIRED

Consult factory as needed

Отзывы: