BGS3 Hardware Interface Description
3.3 Power Up / Power Down Scenarios
63
BGS3_HD_v01.000d
Page 28 of 109
2010-03-26
Confidential / Released
Figure 6:
Powerup with IGT held low before switching on operating voltage at BATT+
For details on how to use EMERG_OFF to reset ap-
plications or external devices see
.