7
© 2011 Cinch Connectors V2 10-2011
Load Header into the holder
• Open the press to load the Header/PCB
assembly
• Alignment blocks must be in the down position
for SE headers (pic. shown)
• Alignment blocks must be in the up position
for LE headers (see previous page)
• Slide/Push the Header/PCB into the holder
(snap fit retention by spring plunges)
Load Enclosure into the holder
• Check SE / LE position on the
previous page
1
2
1
Push for
snap fit
Alignment Block
Spring plunge
1
2
ModICE™ Assembly
NOTE: Check gasket for proper alignment
before assembly. Gasket should not be
twisted or dislodged from corners during
handling.