- 8 -
Propane Units
N
OTE: This step by step procedure is only an outline. Refer to the page(s) indicated
for complete instructions.
PROCEDURE:
PAGE
1)
Hook up LP bottle(s).
13
2)
Turn on gas and adjust regulator.
13
3)
Set temperature controller(s).
16
4)
Make sure tank outlet, sealing hose, and air cleanout valves are closed.
10-11
5)
Open Thermal Regulating Gate and close stack diverter if cabinet
18
heating is required.
6)
Ignite burner.
16
7)
Allow oil temperature to reach approximately 250º F.
8)
Start engine per engine operating instructions.
15
9)
Regulate cabinet temperature.
18
10)
Start agitation.
19
11)
Add material, typically 2-3 biscuits if tank is empty.
19
12)
Allow for sufficient melting.
20
13)
Start material pump.
20
14)
Close Thermal Regulating Gate and open stack diverter.
18
15)
Attach sealing wand extension and adjust flow.
20-21
16)
Begin sealing procedure.
20-21
17)
10-15 minutes before the end of the work day, return temperature
24
control knobs to zero
Operating Sequence
Содержание 105
Страница 43: ... 43 Hydraulic Schematic B2 A2 A1 B1 MD1 MD2 G2 R2 CS1 093 1500PSI R1 P T Model 105 1100 PSI Model 225 800 PSI ...
Страница 49: ... 49 Wiring Diagrams Complete Wiring Diagram No Heated Hose OilThermocouple Material Thermocouple ...
Страница 67: ... 67 6 11 12 1 7 10 5 3 4 2 13 9 Miscellaneous Parts ...
Страница 70: ... 70 Notes ...
Страница 72: ...2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...