- 17 -
Cabinet Pre-Heating (Diesel Units)
WARNING: Always wear gloves when adjusting the damper.
The burner exhaust is equipped with an adjustable Thermal Regulating Gate (A) to help regu-
late the amount of heat diverted to the cabinet for hose, wand and plumbing preheating. At the
end of each day after cleaning out the system, the hose should be coiled and placed in the
cabinet. The wand may remain attached as it will fit in the cabinet.
NOTE: On units equipped with a heated hose, the hose and wand must remain out-
side the cabinet.
COLD START-UP
1)
Open the gate, using the gate lever (B), to the full position. This will force hot air into the
cabinet. The temperature gauge installed in the side of the cabinet will measure actual
temperature.
Never
allow cabinet temperature to exceed 320º F. Open the door
partially if necessary. Adjust gate or close completely to keep temperature
below 320º F.
2)
Once the material in tank has started melting and is circulating through the plumbing
system, close the gate. This will prevent excessive cabinet temperatures and will divert
the heat around the oil for more efficient heating.
A
B
Содержание 105
Страница 43: ... 43 Hydraulic Schematic B2 A2 A1 B1 MD1 MD2 G2 R2 CS1 093 1500PSI R1 P T Model 105 1100 PSI Model 225 800 PSI ...
Страница 49: ... 49 Wiring Diagrams Complete Wiring Diagram No Heated Hose OilThermocouple Material Thermocouple ...
Страница 67: ... 67 6 11 12 1 7 10 5 3 4 2 13 9 Miscellaneous Parts ...
Страница 70: ... 70 Notes ...
Страница 72: ...2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...