cii NEON-FLEX Скачать руководство пользователя страница 1

 
 
 
 
 

 

NEON-FLEX 

 

 

 

Step 1: Measure area where NEON-FLEX will be installed. 

 

Step 2: install mounting track or clips as required; secure  

 

 

 with proper screws for material that track is being 

 

 

 mounted to (wood, concrete, metal etc.) 

 

Step 3: Measure and cut NEON-FLEX extrusion to length. 

 

 

NOTE**

 NEON-FLEX can only be cut at the cut marks stenciled 

 

 

      on the side of the product. Cutting elsewhere will  

 

 

      cause sections of the NEON-FLEX to not light properly. 

 

 

      NEON-FLEX colors RED, ORANGE & YELLOW are marked 

 

 

      and can be cut in 2.5-foot(120v) & 4”(24v) increments.  

                               BLUE, GREEN, WHITE  
 

 

      & RGB colors are marked and can be cut in 1.5 foot 

 

 

      (120v) & 3” (24v) increments. 

 

Step 4: Note which end of extrusion power cord will go on. 2/4 con- 

 

 

  nection holes on end of extrusion will match 2/4 holes on power 

 

 

  cord end cap (see drawing). Start at one end and  

                           start pushing base of extrusion into mounted track, leaving about  
                           1”-1.5” on each end for end cap and power cord cap. 
 

Step 5: Place male pin connector into end of extrusion power cord will 

 

 

  go on (pointed pins goes into extrusion rounded pins into power 

 

 

  cord. Place power cord onto male pin connector and plug into a 

 

 

 

 GFI

 110v/120v outlet. Surge Protection is recommended. 

                               AVOID EXCESSIVE FLEXING 
                               & TWISTING OF PRODUCT-Surge Protection is recommended. 
 

NOTE** VERY IMPORTANT!! WARRANTY VOID!! 

 

 

       

For all outdoor installations or installations where 

 

 

       moisture may be possible; all end caps, power cord 

 

 

       caps, and all splice connections 

MUST

 be sealed  

 

 

       water-tight with outdoor waterproof silicone adhesive. 

 

 

       (Most silicones take 24hrs to fully cure so we recom- 

 

 

       mend checking all connections after installation  

                               periodically. 

Water/moisture will cause failures.   

                               Water/Moisture intrusion is NOT covered under 
                               Warranty. 

We recommend using 

       PVC glue to attach end caps and power cord caps and 

       then sealing edges with silicone then use provided 
       shrink tubing and silicone edges of that after heating. 

 

       For all splice connections you must put silicone             

on both sides of the connection and allow  24hrs for full cure. 
(See pictures) 

INSTALLATION GUIDE

Отзывы: