Procedure 2-1
To Install 3930 on a Wall
Step
Action
1
Install the wallmount bracket on the chassis as instructed in
Wallmount Bracket” on page 8-6
.
Note:
If your installation location does not allow rear access to the chassis,
the supplemental ground cable needs to be routed and connected to the rear
of the chassis before mounting the chassis.
2
Install supplemental ground. See
“Installing Supplemental Ground” on page
3
Install the power supplies and connect power. Both AC and DC power supply
modules are available. For detailed instructions see either:
•
“Installing an AC Power Supply” on page 2-19
•
“Installing a DC Power Supply” on page 2-21
Verify that the PWR LED on the front of the device is green.
4
Install the alarm cable (if required). See
.
5
Install SFP/SFP+ optics, see
“To Install a Pluggable Optic” on page 2-26
.
6
Install faceplate cabling for the UNI and NNI connections. See
Installation and Guidelines” on page 2-10
Note:
Dress and secure the cables using local practices, ensuring that the
weight of the cable is supported and does not drag on the plug.
You have installed the 3930 on a wall.
WARNING:
For units with side vent holes, the vent holes must be positioned at the
top when the chassis is wall mounted. In some cases where a particular direction (left
or right) is required for cable routing and faceplate access, the bracket may need to
be mounted with the flange at the top of the unit resulting in the unpainted underside
of the unit facing outward when installed.