![Ciena 170-3916-900 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/ciena/170-3916-900/170-3916-900_hardware-installation-and-start-up-manual_2606953020.webp)
2-4
Installation
3916 Service Delivery Switch
Hardware Installation and Start-up Manual
009-3226-001 Standard Revision E
Copyright
©
2013-2015 Ciena
®
Corporation
July 2015
Package Contents
Upon receipt, examine all shipping containers and their contents. Carefully
unpack the 3916 from the packing material. Visually inspect all parts for
damage.
The following items are shipped with the 3916:
•
Chassis
•
Mounting bracket kit for 19” frame (two brackets, two cable supports, two
8-32 x 1/2 length screws used to attach the cable supports to the brackets,
and four 8-32 x 5/16 length pan head screws used to attach the brackets
to the side of the chassis)
•
Four self-adhesive rubber feet
If the unit is damaged or if any of the above items are missing, please contact
your sales representative.
Note:
Mounting brackets for 23-inch racks are also available. If they are
required for your installation, you need to order these brackets separately.
You will also need to order:
•
Power cable(s)
•
SFP modules for the 100/1000 Mbps ports (up to 6 ports)
•
Faceplate cabling (Cat 5e STP and optical cabling to match the SFP
connector types used)
Required Tools and Supplies
For rack mount installations you will also require the following tools:
•
Flat head screwdriver
•
Phillips #2 screwdriver
•
Ratchet crimper (for ground wire/lug)
•
Wire-strippers (for DC power cable)
•
Digital Volt Ohm Meter
•
Rack screws (4 per device)
•
Cable ties / cord retainers — to secure ground, power and interface
cabling
•
Fork terminal spade lugs (3 per DC power supply) — to install power
cabling to a DC system
•
Power wire (14 to 18 AWG) — to install power cabling to a DC system
provides a summary of the DC lugs that are
recommended for use with the 3916.
Содержание 170-3916-900
Страница 87: ......