
PART III: OPERATION
31
Fig. 17 - Burner control panel
Keys
S1
Main switch
S2
Reset pushbutton for control box
S3
CMF switch (0=stop, 1=low flame, 2=high flame, 3=automatic) - fully modulating burners only
B1
Lock-out LED
B2
Hi-flame operation LED
B3
Lo-flame operation LED
B4
“Ignition transformer operation” LED
B5
“Fan motor overload tripped” LED
B6
Stand-by signalling lamp
G1
Gas valves EV2 operation signalling lamp
G2
Gas valves EV1 operation signalling lamp
G3
Gas pressure switch signal lamp
G4
Gas proving system lockout signalling lamp
A1
Burner Modulator (only on fully modulating burners)
P1
“Gas in the network” signalling LED (pilot)
P2
“Solenoid valve EVP operation” LED
S1
S3
A1
G2
G1
G3
G4
B1
B2 B3
B4
B5
B6
S2
P1
P2
Содержание HR1025
Страница 38: ...PART III OPERATION 38 Fig 19 Bergonzo B nozzle example with 850kg h nozzle Pump flow rate Nozzle flow rate ...
Страница 50: ...PART IV MAINTENANCE 50 10 5 2 1 1 ...
Страница 54: ......