
PART II: INSTALLATION
25
3.4
Integrated proving system (burners equipped with LME7x, LMV, LDU)
This paragraph describes the integrated proving system operation sequence:
z
At the beginning both the valves (EV1 and EV2) must be closed.
z
Test space evacuating: EV1 valve (burner side) opens and keep this position for a preset time (td4), in order the bring the test
space to ambient pressure.Test atmospheric pressure: EV1 closes and keep this position for a preset time (test time td1). The
pressure switch PGCP has not to detect a rise of pressure.
z
Test space filling: EV2 opens and keep this position for a preset time (td3), in order to fill the test space.
z
Test gas pressure: EV2 closes and keep this position for a preset time (td2). The pressure switch PGCP has not to detect a pres-
sure drop down.
If all of the test phases are passed the proving system test is successful, if not a burner lockout happens.
On LMV5x and LMV2x/3x and LME73 (except LME73.831BC), the valve proving can be parameterized to take place on startup, shut-
down, or both.
On LME73.831BC the valve proving is parameterized to take place on startup only.
3.5 Gas Proving System VPS504 (Option)
The VPS504 check the operation of the seal of the gas shut off valves. This check, carried out
as soon as the boiler thermostat gives a start signal to the burner, creates, by means of the
diaphragm pump inside it, a pressure in the test space of 20 mbar higher than the supply pres-
sure.
When wishing to monitor the test, install a pressure gauge ranged to that of the pressure sup-
ply point
PA
. If the test cycle is satisfactory, after a few seconds the consent light
LC
(yellow)
comes on. In the opposite case the lockout light
LB
(red) comes on. To restart it is necessary
to reset the appliance by pressing the illuminated pushbutton
LB
.
PS
/
EV1
EV2
PGCP
LC
LB
PA
Содержание HR1025
Страница 38: ...PART III OPERATION 38 Fig 19 Bergonzo B nozzle example with 850kg h nozzle Pump flow rate Nozzle flow rate ...
Страница 50: ...PART IV MAINTENANCE 50 10 5 2 1 1 ...
Страница 54: ......