page 6/14
F
F
I
I
X
X
I
I
N
N
G
G
INSTALLATION
:
Please ensure that the safe is correctly positionned and that the safe is level and
flush; this will avoid any “run” of the door and will ensure a correct functioning
and longevity of the door opening parts.
1- Position the safe in it’s definitive place.
2- Ensure that the safe is level by using a
spirit level. (use wedges if required)
3- Open the door, and check that there is no
run (i.e. that the door is flush)
If there is any run please review the wedging.
-
BASE FIXING
- All
DuoGuard models are prepared for base fixing.
- A M12 dynabolt is included with the product.
- Pour le perçage, suivre la procédure ci-dessus.
5-Mettre en place le
capuchon en plastique.
wage
1-Remove the plastic cap
and drill a hole in the floor
to a minimum depth
of 120 mm.
2-Blow to evacuate any
dust.
3-Place the expansion
bolt in the hole.
4- Tighten the expansion
bolt using a torque
wrench to150 NM.
4
Содержание Duoguard 110
Страница 7: ...page 7 14 4 5 S S i i z z e e...