RECOMMENDED START-UP PROCEDURES
1.

Close globe valve on outlet side of boiler. (Customer Supplied)

2. Turn on boiler

and allow pressure to build up to operating

pressure.

3.

Only open globe valve by quarter turns at first, introducing small-
er amounts of steam into process. 

Avoid opening globe valve all at

once.

This will eliminate the possibility of evacuating the boiler of

water caused by the suddenly increased boiling of the water in the
vessel as the pressure is reduced. On boilers where constant pres-
sure is not maintained, globe valve should be kept partially closed.
This will maintain a constant head on the boiler and stabilize any
fluctuation in boiler water level.

NOTE:

For best boiler performance, a steam valve 1/4” smaller

than size of safety valve should be plumbed as close as practicable
to steam outlet.

MANUAL BLOWDOWN INSTRUCTIONS

Blowdown is an essential part of boiler operation. It is the best pre-
ventive maintenance you can give your boiler and will add years of life
to the unit. Make sure a blowdown schedule is established and fol-
lowed regularly.

In extremely hard water areas blowdown is necessary once a day.

In soft water areas, once each week. If there is a particular problem
which applies to your own local water condition other than mineral
content, take this into consideration in determining which schedule is
to be followed.

1.

At the end of the working day, while boiler is still operating, turn
switch to the OFF position and close water supply valve. De-ener-
gize wall mounted safety switch.

2.

If blowing-down into a receptacle, allow pressure to decrease to
15-20 psi before opening blowdown valve.

3.

It is preferable to connect the blowdown valve directly into a
drainage system. If this is done, the boiler can be discharged at
operating pressure.

4.

When discharge is complete and boiler is drained – 
a. close the blowdown valve;
b. open water supply valve;
c. put boiler switch to the “ON” position; and, (d) close wall

mounted safety switch.

5.

When refilling is complete turn off the boiler switch unless further
operation is desirable.

6.

If you have been supplied with a Manual Reset Low Water control
as required in some states, the reset button on the control must be
pushed before boiler will begin developing pressure. (Do not push
reset until boiler has filled with water.) The use of chemical boiler
cleaning compounds in these boilers voids all warranties unless
approved by manufacturer. Some compounds will damage copper-
sheathed heating elements, thereby shortening their life.

AUTOMATIC BLOWDOWN INSTRUCTIONS
(IF FURNISHED) (See Figures 14 and 15)

The Automatic Blowdown is a device which automatically starts

up your boiler in the morning; shuts it down at night and blows down
(partially drains) the main boiler drain and the low water cut-off col-
umn for a predetermined time interval each working day.

The heart of the unit is an electrically operated straight through

type ball valve. It is specially designed to handle dirty, corrosive fluids
and particles without requiring cleaning or the use of a strainer.

Both the valve and the boiler are controlled by an electric control unit
which indicates with pilot lights when the drain valve is in the opened
or closed position and when the boiler is ON or OFF. In addition to the
automatic control function, the unit has a push button which momen-
tarily de-energizes the boiler and opens the drain valve regardless of
the time of day.

The unit may also be used to blow down boilers which run continu-
ously, day and night.

INITIAL TESTING -

Set the switch marked “Boiler Normal/24-

hour duty” located on the panel box to the “Boiler Normal” position.

On the large timer set the “ON” tab to 8 AM and the “OFF” tab to

8 PM. Set the small, time delay relay to “0".

Turn the larger timer by hand until the “ON” tab passes the “TIME
NOW” indicator so that the “TIME NOW” arrow indicates 10AM.

Energize the main feed to the “line terminals” of the unit. The

“boiler normal” pilot light as well as the “drain valve closed” light
should glow.

Hold down the “drain” button for about six seconds. The “boiler

normal” light should go out immediately as well as the “drain valve
closed” light. It takes about 4 seconds for the drain valve to open fully
at which time the “drain valve open” light should light. As soon as the
“drain” button is released, the valve begins to close. When it reaches
the closed position, the “drain valve closed” light and the “boiler nor-
mal” light should light up again.

OPERATION

Timer

Figure 14 – Automatic Blowdown Control Cabinet

Boiler Normal

Valve Open

Valve Closed

Toggle Switch

Manual Drain Push Button

Valve Actuator

Motor Drain
Ball Valve

Pilot Lights and Switches

Figure 15 – Display View of Automatic Blowdown Control Cabinet

Содержание CHS-1080

Страница 1: ...t Boilers INSTALLATION CAUTION To avoid electrical shock hazard boilers must be suitably grounded to earth NOTE Chromalox boilers are pre tested before shipment no internal piping or wiring is necessa...

Страница 2: ...34 40 2 NPT 1 NPT 1 NPT CHS 720 thru CHS 810 76 58 45 47 94 6 1 1 2 38 44 2 NPT 1 NPT 1 NPT CHS 945 thru CHS 1080 76 68 45 47 94 6 1 1 2 38 44 2 NPT 1 NPT 1 NPT CHS 1215 thru CHS 1620 86 76 56 50 98...

Страница 3: ...ety feature that prevents a dangerous situ ation should a contactor or relay stick Activation of the shunt trip device will completely disconnect the boiler from the power sup ply See Figure 7 3 Since...

Страница 4: ...Groups To Other Heater Groups Typical 3 Phase Heater Group To Power Curcuit Relay Step Sequencer Figure 9 Power Circuit Detail Low Water Probe 120 Volt Control Voltage Hi Limit Control Electronic Resi...

Страница 5: ...he other is used as a high limit control To deter mine the difference in the controls the high limit has a manual reset lever on top of the case Also there is no differential scale present 2 On all co...

Страница 6: ...sure Do not push reset until boiler has filled with water The use of chemical boiler cleaning compounds in these boilers voids all warranties unless approved by manufacturer Some compounds will damage...

Страница 7: ...ated on the inside of the control panel to boiler normal if the boiler is to be shut down each night Set it to 24 hour duty if the boiler is to remain on continuously 24 hours per day except during bl...

Страница 8: ...of the controlled medium will cause a change in the number of elements energized to compensate for it thus keeping the pressure constant This process is called modula tion PROPORTIONAL PRESSURE CONTR...

Страница 9: ...boiler off remove wiring from pressure control on sequencer low voltage terminal board 2 Turn on boiler to supply the voltage to sequencer Short terminal R and B for counter clockwise rotation and ter...

Страница 10: ...gized for safety When power resumes the control will re stage the loads one at a time Refer to the diagram for visual description of progressive sequencing PROGRESSIVE SEQUENCING The solid state seque...

Страница 11: ...nge 5 Thoroughly clean boiler flange of all foreign material Be certain no part of old gasket remains on boiler flange 6 Apply Slic Tite Gasket Compound or equal to both surfaces of new gasket supplie...

Страница 12: ...amp 128 118530 003 Power Circuit Fuse Class J 100 amp 128 118530 004 Valves and Gauges Description Part Number Pressure Gauge 3 1 2 160 344 118529 024 Gauge Glass Assembly 347 118537 002 Sight Glass 3...