INSTALLATION (cont’d.)

SPECIAL INSTRUCTIONS FOR CUSTOMERS SUPPLYING
THEIR OWN CONDENSATE OR PUMP SYSTEMS.
1.

Check the voltage of the motor before making the wiring connec-
tion. Some Chromalox boilers are supplied with dual voltage sys-
tems. The motor should always match the voltage of the control
circuit.

2.

The motor circuit should be wired into the pump control as shown
in wiring diagram.

3.

A heavy-duty vacuum breaker is required when condensate system
is used. (part number ES-89369)

WIRING

1.

Wiring to boiler should be as per appropriate wiring diagram sup-
plied with boiler and in accordance with Local and National
Electrical Codes.

2. SAFETY SWITCHES 

- Purchaser should use a safety switch

between his main power source and the boiler. The safety switch
should use circuit breakers or fuses and be in accordance with
NEC and local codes.
Serious thought should be given to the advisability of using a shunt
trip safety switch of the circuit breaker type as an additional safe-
ty precaution. It is possible to utilize the spare contacts in the low

water cutoff to energize the shunt mechanism on the safety switch.
This is an additional safety feature that prevents a dangerous situ-
ation should a contactor or relay stick. Activation of the shunt trip
device will completely disconnect the boiler from the power sup-
ply. (See Figure 7).

3.

Since boiler heating elements are susceptible to lightning damage,
plants not having lightning arresters that have above-ground elec-
trical cable supply sources should install lightning arresters in the
proper size to meet the boiler kw load.

1/2” Water Line

1/2” Solenoid

6-5/8”

1/2” Strainer

3”

7-1/4”

15-1/4” for CHS-150
16-3/8” for CHS-180 to 300

1” Discharge to Boiler

4-1/4”

5-7/8”

Width – 6-1/2

Figure 4 – Motor and Pump Assembly

To Aux.

L.W. C.O.

Hi-Limit

Pressuretrol

Operating

Pressuretrols

To L2 on

Terminal Strip

Common

*Standard on CHS-150 to CHS-300 units in lieu of step

sequencer and operating pressuretrol shown in Figure 8

Figure 6 – Pressuretrol Control System*

Shunt Trip Device

(Supplied by Others)

Supply

Voltage

To Field
Wiring
Input
Terminal

To
L2

To Main

Switch

To Motor Starter

L.W.C.O. &

Pump Control

To Aux.

L.W.C.O.

Figure 7 – Safety Switch (Field Installed)

“W” Dimension – Overall Width

Strainers

H

1/2” 

Water

Line

L

1” Outlet

to Boiler

Motor and

Pump

1” Drain

1” Vent

1” Condensate

Return

Figure 5 – Condensate Return System

Model

Max.

Tank Cap.

Number

PSI

(Gal.)

L

H

W

CHS-150

thru

125

33

33-1/4

41-1/2

21

CHS-300

CHS-360

thru

150

40

40

41-1/2

21

CHS-420

Содержание CHS-1080

Страница 1: ...t Boilers INSTALLATION CAUTION To avoid electrical shock hazard boilers must be suitably grounded to earth NOTE Chromalox boilers are pre tested before shipment no internal piping or wiring is necessa...

Страница 2: ...34 40 2 NPT 1 NPT 1 NPT CHS 720 thru CHS 810 76 58 45 47 94 6 1 1 2 38 44 2 NPT 1 NPT 1 NPT CHS 945 thru CHS 1080 76 68 45 47 94 6 1 1 2 38 44 2 NPT 1 NPT 1 NPT CHS 1215 thru CHS 1620 86 76 56 50 98...

Страница 3: ...ety feature that prevents a dangerous situ ation should a contactor or relay stick Activation of the shunt trip device will completely disconnect the boiler from the power sup ply See Figure 7 3 Since...

Страница 4: ...Groups To Other Heater Groups Typical 3 Phase Heater Group To Power Curcuit Relay Step Sequencer Figure 9 Power Circuit Detail Low Water Probe 120 Volt Control Voltage Hi Limit Control Electronic Resi...

Страница 5: ...he other is used as a high limit control To deter mine the difference in the controls the high limit has a manual reset lever on top of the case Also there is no differential scale present 2 On all co...

Страница 6: ...sure Do not push reset until boiler has filled with water The use of chemical boiler cleaning compounds in these boilers voids all warranties unless approved by manufacturer Some compounds will damage...

Страница 7: ...ated on the inside of the control panel to boiler normal if the boiler is to be shut down each night Set it to 24 hour duty if the boiler is to remain on continuously 24 hours per day except during bl...

Страница 8: ...of the controlled medium will cause a change in the number of elements energized to compensate for it thus keeping the pressure constant This process is called modula tion PROPORTIONAL PRESSURE CONTR...

Страница 9: ...boiler off remove wiring from pressure control on sequencer low voltage terminal board 2 Turn on boiler to supply the voltage to sequencer Short terminal R and B for counter clockwise rotation and ter...

Страница 10: ...gized for safety When power resumes the control will re stage the loads one at a time Refer to the diagram for visual description of progressive sequencing PROGRESSIVE SEQUENCING The solid state seque...

Страница 11: ...nge 5 Thoroughly clean boiler flange of all foreign material Be certain no part of old gasket remains on boiler flange 6 Apply Slic Tite Gasket Compound or equal to both surfaces of new gasket supplie...

Страница 12: ...amp 128 118530 003 Power Circuit Fuse Class J 100 amp 128 118530 004 Valves and Gauges Description Part Number Pressure Gauge 3 1 2 160 344 118529 024 Gauge Glass Assembly 347 118537 002 Sight Glass 3...

Отзывы: