Chromalox CES-100 Скачать руководство пользователя страница 12

ADJUSTING OPERATING PRESSURE CONTROLS
1.

Chromalox boilers are supplied with operating and high limit pres-
sure controls. One is used for controlling the operating pressure of
the boiler while the other is used as a high limit control. To deter-
mine the difference in the controls, the high limit has a manual reset
lever on top of the case. Also, there is no differential scale present.

2.

On all controls, the pressure adjusting screw on the top of the case
sets the desired pressure. Turning the screw counterclockwise
reduces the pressure setting 

(CUT OUT)

(See Figure 2). High limit

control should be set at 10 psig above the operating pressure of the
boiler.

3.

The differential adjusting screw on the operating control is set in the
same manner as the pressure adjusting screw. The 

CUT OUT

set-

ting minus the differential setting, equals 

CUT IN

pressure of the

operating control.

To check operation of the controls, close steam outlet valve and adjust
operating pressure control to a low pressure setting. Also, set high limit
control at 10 psig above operating pressure control. Turn on boiler, and
allow pressure to build up. When pressure gauge reading approaches
set point of pressure control, the switch will trip and shut off boiler.
Turn off boiler.

To reset pressure control, bleed off enough pressure in the boiler by

opening steam outlet drain, or blowdown valve to allow the operating
control to reset.

4. HIGH LIMIT PRESSURE CONTROL OPERATION

The high limit is tested in the same manner but with the operating
control set above the pressure setting of the high limit. (Figure 3)

CAUTION:

This is for test purposes only!

When the high limit trips, turn off boiler and reset high limit to
proper setting. The manual reset level must be pushed to resume
operation upon startup.

Differential Adjusting Screw

Pressure Adjusting Screw

Terminal 1 Open on
Pressure Rise

Terminal 2
Common

Differential
Setting
Indicator

Pressure
Setting
Indicator

Pressure
Adjusting
Screw

Terminal 1 Open on
Pressure Rise

Terminal 2
Common

Cutout
Pressure
Indicator

Manual Reset Lever

CES-12 through CES-72, one pressure control supplied; CES-100 through CES-
180, two pressure controls supplied.

Figure 2

Figure 1

12

OPERATION

OPERATION

RECOMMENDED START-UP PROCEDURES
1.

Close globe valve on steam outlet side of boiler. (Customer Supplied)

2.

Turn on boiler and allow pressure to build up to operating pressure.

3.

Only open globe valve at quarter turns at first, introducing smaller
amounts of steam into process. Avoid opening globe valve all at
once. This will eliminate the possibility of evacuating the boiler of
water caused by the suddenly increased boiling of the water in the
vessel as the pressure is reduced. On boilers where constant pres-
sure is not maintained, globe valve should be kept partially closed.
This will maintain a constant head on the boiler and stabilize any
fluctuation in boiler water level.

Note:

For best boiler performance, a 1/4” less steam valve 

than size of safety valve should be plumbed as close as practi-
cable to steam outlet. Where 1/2” safety valve is used on boil-
er, a 1/4” steam valve is recommended.

MANUAL BLOWDOWN INSTRUCTIONS

Blowdown is an essential part of boiler operation. It is the best

preventative maintenance you can give your boiler and will add
years of life to the unit. Make sure a blowdown schedule is estab-
lished and followed regularly.

In extremely hard water areas, blowdown is necessary once a

day. In soft water areas, once each week. If there is a particular
problem which applies to your own local water condition other

than mineral content, take this into consideration in determining
which schedule is to be followed.

1.

At end of the working day, while boiler is still operating, turn
switch to the OFF position and close water supply valve. De-ener-
gize wall mounted safety switch.

2.

If blowing-down into a receptacle, allow pressure to decrease to
15-20 psi before opening blowdown valve.

3.

It is preferable to connect the blowdown valve directly into a
drainage system. If this is done, the boiler can be discharged at
operating pressure.

4.

When discharge is complete and boiler is drained — (a) close the
blowdown valve; (b) open water supply valve; (c) put boiler switch
in the ON position; and, (d) close wall mounted safety switch.

5.

When refilling is complete, turn off the boiler switch unless further
operation is desirable.

6.

If you have been supplied with a Manual Reset Low Water control
as required in some states, the reset button on the control must be
pushed before boiler will begin developing pressure. (Do not push
reset until boiler has filled with water.)

The use of chemical boiler cleaning compounds in these boilers
voids all warranties unless approved by manufacturer. Some com-
pounds will damage copper sheathed heating elements to shorten
useful life.

Содержание CES-100

Страница 1: ...3 50 6 17 CES 135 13 9 136 30 5 410 8 50 4 50 8 17 1 30 CES 160 16 1 157 5 30 5 475 7 60 3 60 7 22 5 CES 180 18 4 180 30 5 543 8 60 4 60 8 22 5 Chromalox DIVISION 4 SECTION CES SALES REFERENCE DATE SE...

Страница 2: ...nection Conduit Box Element I Steam Outlet Sight Glass Element Access Door 5 8 7 16 Bolt Hole typical Drain Blowdown Valve K A B C Check Valve D H F E G Operating Pressure Control Safety Valve Outlet...

Страница 3: ...ust be main tained 3 Complete all piping to boiler Connect water line to tagged fitting on the motor and pump assembly if used or to tagged fitting on water control feeder 4 When any type of feed othe...

Страница 4: ...ed 6 WARNING Substitution of components or modifica tion of wiring system voids the warranty and may lead to dangerous operating conditions 7 SPECIAL INSTRUCTIONS FOR CUSTOMERS SUPPLY ING THEIR OWN CO...

Страница 5: ...R C2 FU4 FU5 FU6 2L1 2L3 2L2 Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 3 2PS BR Heater Contactor Feed Water Boiler On 3 GND B FU6 B 1PB Off 1 GND 1 HTR C...

Страница 6: ...3 C2 FU7 FU8 FU9 C3 3L1 1L3 3L2 3 HTR C3 Heater Contactor Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 5 2PS BR Heater Contactors Feed Water Boiler On 3 GND...

Страница 7: ...C3 C4 FU 10 11 12 4 Htr FU10 FU11 FU12 C4 4L1 4L3 4L2 4 HTR C4 Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 7 2PS BR Heater Contactor Feed Water Boiler On...

Страница 8: ...ND Cabinet Exterior Left Side Cabinet Exterior Right Side Panel Layout Feed Water Electrical Connection Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 9 FU 1...

Страница 9: ...H1 H4 H2 H3 FU24 FU23 FU22 FU21 FU20 FU13 C8 C7 7 HTR 6 HTR 7L1 8L3 8L2 8L1 5L3 7L2 C5 C7 Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 11 FU 1 2 3 FU 4 5 6...

Страница 10: ...7L2 FU FU FU C7 C6 Heater Contactor Heater Contactor Heater Contactor Heater Contactor Heater Contactor Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 13 FU...

Страница 11: ...in valve or release man ual blowdown switch If low water cutout is automatic reset pump or solenoid will return water level to normal If low water cutout is manual reset then manual reset button on Mc...

Страница 12: ...ustomer Supplied 2 Turn on boiler and allow pressure to build up to operating pressure 3 Only open globe valve at quarter turns at first introducing smaller amounts of steam into process Avoid opening...

Страница 13: ...E CLOSED and the BOILER ON should light up again Now turn the wheel on the large timer until the OFF tab passes the TIME NOW arrow The BOILER ON light should go out and the valve should begin to open...

Страница 14: ...circuit balance is achieved The slightest change in the pressure of the controlled medium will cause a change in the number of elements energized to compensate for it thus keeping the pressure constan...

Страница 15: ...stage loads of the type used in Chromalox steam boilers It features progressive sequencing first on first off which equalizes the operating time of each load This control gives visual indication of e...

Страница 16: ...ed 3 Connect piping from discharge to water inlet check valve on boil er with minimum of 90 bends or other restrictions 4 All electrical wiring should be done by licensed electricians in accordance wi...

Страница 17: ...sure to drop to zero before ser vicing WARNING Provision should be made to prevent water damage from any eventual leaking of boiler or com ponents Install near a floor drain 2 On automatic feed units...

Страница 18: ...end life 2 If generator is undersized for its application heaters will be over worked and reach end of life sooner 3 Element has been overheated due to excessive scale build up The scale acts as an i...

Страница 19: ...50Hz 193 300175 002 Motor only used in ES 38020 115V 60Hz 193 300175 004 Strainer used in ES 38020 351 118664 001 V Band Mount used in ES 38002 ES 38020 355 300174 001 Solenoid Valve used in ES 38002...

Страница 20: ...0 amp 600V 128 121133 066 60 amp 600V 128 121133 067 Fuse Block 35 60 amp 60 amp 600V 129 047445 002 Power Terminal Blocks 3 pole 115 amp 1 line circuit 1 load circuits 303 071809 032 3 pole 175 amp 1...

Отзывы: