After proper wiring and piping of boiler system is complete, testing of
controls can start. 

Before testing controls, it is recommended that

all contactor fusing be removed.

This is to prevent possible element

failure under test conditions.

A. OPERATING AND TESTING THE McDONNELL &

MILLER LOW WATER CUTOFF CONTROL.
1.

Be sure all valves from incoming water supply are fully open.

Turn boiler switch to “ON” position,

pump or solenoid

valve will energize, allowing boiler to fill with water. Proper
water level is automatically reached with level control sup-
plied. Pump or solenoid feed will shut off at proper water level.
Contactor(s) will energize, supplying power voltage to ele-
ments.

2. Checking operation of pump switch.

(Figure 1) With water

level visible in sight glass, partially open drain valve at bottom
of boiler. If automatic blowdown supplied, push manual blow-
down switch until valve open light is on, hold for few seconds.
Water level will fall, allowing float to trip pump switch to
“ON” position. Close drain valve or release manual blowdown
switch.
Pump motor or solenoid valve will energize and water level
will resume to normal level in sight glass.

3. Checking low water cutout switch operation,

open drain

valve completely. If automatic blowdown supplied, push in
and hold manual blowdown switch until water level falls
enough to trip cutout switch. Close drain valve or release man-
ual blowdown switch. If low water cutout is automatic reset,
pump or solenoid will return water level to normal. If low
water cutout is manual reset, then manual reset button on
McDonnell & Miller low water cutoff control must be pushed
to complete circuit. 

Turn off boiler. Reinstall contactor

fuses.

WARNING:

Be sure all electrical connections are tight

before energizing boiler. Reset all manual reset con-
trols by pushing reset buttons on: (1) high limit control
located on top of boiler and (2) McDonnell & Miller
located on the side of boiler.

Diagram 14

Typical Export Boiler

TYPICAL WIRING DIAGRAMS

C1

CR

C2

C3

2PS

1PS

On

Off

FU13

IFS

O

O

Y

BR

B

B

1PB

1

2

W

R

Boiler

On

9.9

Heater Contactor

1LT

2 HTR

1 HTR

1L1

1L3

1L2

2L1

2L3

2L2

C1

C2

FU1

FU9

FU8

FU7

FU6

FU5

FU4

FU3

FU2

C3

3 HTR

3L1

3L3

3L2

L1

L3

L2

Heater Contactor

FU12

FU11

FU10

C4

4 HTR

4L1

4L3

4L2

Heater Contactor

Heater Contactor

346V 3Ø 50 HZ

220 VAC Single Phase Control Circuit

1

C4

1CR-1

BW

1CR-2

Customer Pump

Connection

FU

1  2  3

FU

4  5  6

FU

7  8  9

C1

C4

C2

3

HTR

2

HTR

1

HTR

4

HTR

1

2

2TB 1TB

GND

2

GND

  1

GND

FU13

1PB

Cabinet Exterior Left Side

Cabinet Exterior Right Side

Panel Layout

Feed Water

Electrical

Connection

FU

10

11  12

C3

1CR

3

GND

1

GND

2

GND

Wire Color Code

B

= Black

BR = Brown
R

= Red

O

= Orange

Y

= Yellow

G

= Green

BL = Blue
W = White

11

A

C

D

B

Line

Pump

Low-Water

Cut-Off

Terminals

Alarm

Circuit

Terminals

Pump

Circuit

Terminals

Pump

Switch

Cut-off

and

Alarm

Switch

Adjusting

Screws

Figure 1

— Automatic Reset Low-Water Cutoff Junction Box

PRE-OPERATION CHECK

Содержание CES-100

Страница 1: ...3 50 6 17 CES 135 13 9 136 30 5 410 8 50 4 50 8 17 1 30 CES 160 16 1 157 5 30 5 475 7 60 3 60 7 22 5 CES 180 18 4 180 30 5 543 8 60 4 60 8 22 5 Chromalox DIVISION 4 SECTION CES SALES REFERENCE DATE SE...

Страница 2: ...nection Conduit Box Element I Steam Outlet Sight Glass Element Access Door 5 8 7 16 Bolt Hole typical Drain Blowdown Valve K A B C Check Valve D H F E G Operating Pressure Control Safety Valve Outlet...

Страница 3: ...ust be main tained 3 Complete all piping to boiler Connect water line to tagged fitting on the motor and pump assembly if used or to tagged fitting on water control feeder 4 When any type of feed othe...

Страница 4: ...ed 6 WARNING Substitution of components or modifica tion of wiring system voids the warranty and may lead to dangerous operating conditions 7 SPECIAL INSTRUCTIONS FOR CUSTOMERS SUPPLY ING THEIR OWN CO...

Страница 5: ...R C2 FU4 FU5 FU6 2L1 2L3 2L2 Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 3 2PS BR Heater Contactor Feed Water Boiler On 3 GND B FU6 B 1PB Off 1 GND 1 HTR C...

Страница 6: ...3 C2 FU7 FU8 FU9 C3 3L1 1L3 3L2 3 HTR C3 Heater Contactor Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 5 2PS BR Heater Contactors Feed Water Boiler On 3 GND...

Страница 7: ...C3 C4 FU 10 11 12 4 Htr FU10 FU11 FU12 C4 4L1 4L3 4L2 4 HTR C4 Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 7 2PS BR Heater Contactor Feed Water Boiler On...

Страница 8: ...ND Cabinet Exterior Left Side Cabinet Exterior Right Side Panel Layout Feed Water Electrical Connection Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 9 FU 1...

Страница 9: ...H1 H4 H2 H3 FU24 FU23 FU22 FU21 FU20 FU13 C8 C7 7 HTR 6 HTR 7L1 8L3 8L2 8L1 5L3 7L2 C5 C7 Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 11 FU 1 2 3 FU 4 5 6...

Страница 10: ...7L2 FU FU FU C7 C6 Heater Contactor Heater Contactor Heater Contactor Heater Contactor Heater Contactor Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 13 FU...

Страница 11: ...in valve or release man ual blowdown switch If low water cutout is automatic reset pump or solenoid will return water level to normal If low water cutout is manual reset then manual reset button on Mc...

Страница 12: ...ustomer Supplied 2 Turn on boiler and allow pressure to build up to operating pressure 3 Only open globe valve at quarter turns at first introducing smaller amounts of steam into process Avoid opening...

Страница 13: ...E CLOSED and the BOILER ON should light up again Now turn the wheel on the large timer until the OFF tab passes the TIME NOW arrow The BOILER ON light should go out and the valve should begin to open...

Страница 14: ...circuit balance is achieved The slightest change in the pressure of the controlled medium will cause a change in the number of elements energized to compensate for it thus keeping the pressure constan...

Страница 15: ...stage loads of the type used in Chromalox steam boilers It features progressive sequencing first on first off which equalizes the operating time of each load This control gives visual indication of e...

Страница 16: ...ed 3 Connect piping from discharge to water inlet check valve on boil er with minimum of 90 bends or other restrictions 4 All electrical wiring should be done by licensed electricians in accordance wi...

Страница 17: ...sure to drop to zero before ser vicing WARNING Provision should be made to prevent water damage from any eventual leaking of boiler or com ponents Install near a floor drain 2 On automatic feed units...

Страница 18: ...end life 2 If generator is undersized for its application heaters will be over worked and reach end of life sooner 3 Element has been overheated due to excessive scale build up The scale acts as an i...

Страница 19: ...50Hz 193 300175 002 Motor only used in ES 38020 115V 60Hz 193 300175 004 Strainer used in ES 38020 351 118664 001 V Band Mount used in ES 38002 ES 38020 355 300174 001 Solenoid Valve used in ES 38002...

Страница 20: ...0 amp 600V 128 121133 066 60 amp 600V 128 121133 067 Fuse Block 35 60 amp 60 amp 600V 129 047445 002 Power Terminal Blocks 3 pole 115 amp 1 line circuit 1 load circuits 303 071809 032 3 pole 175 amp 1...