Installation
3-7
4. Set I (indicates expected output current), VCUT (indicates the cut off voltage to stop this
step and skip to next), ICUT (indicates the cut off current to stop this step and skip to
next), TIME (indicates the time for count down), V (indicates the voltage of charge state
changing from CC to CV), P (indicates the power for changing from CC to CP), S.R.
(indicates the slew-rate setting with single channel up to 2.4A/ms) accordingly. Press
Enter once a condition is set and skip to next condition setting. When S.R. is set, click
EXIT, the main screen will ask if updating the screen, click yes and the screen returns as
the figure shown below. Press Output and the screen will prompt OUTPUT pattern on the
right comer.
5. It completes the operation of charge in CC.
6. Same as the above, the operation can also be done for CV and CP.
3.3.3 Operating for Discharge
1. First use cable to connect the Tester and EUT.
2. Using CC mode as the example for introduction.
3. Press DISCH and CC keys to the parameter.
4. Set I (indicates expected output current), VCUT (indicates the cut off voltage to stop this
step and skip to next), ICUT (indicates the cut off current to stop this step and skip to
next), TIME (indicates the time for count down), V (indicates the voltage of charge state
changing from CC to CV), P (indicates the power for changing from CC to CP), S.R.
(indicates the slew-rate setting with single channel up to 2.4A/ms) accordingly. Press
Содержание 69200-1
Страница 1: ......
Страница 2: ......
Страница 3: ...Charge Discharge Controller 69200 1 User s Manual Version 1 3 April 2017...
Страница 8: ...vi...
Страница 12: ......
Страница 14: ......
Страница 20: ......
Страница 70: ......
Страница 78: ......
Страница 80: ...Charge Discharge Controller 69200 1 User s Manual 5 2 please notify Chroma for calibration...
Страница 82: ......
Страница 84: ......