2. Remove the front top lid.
3. Remove the rear top lid.
4. Remove the three screws securing the extractor fan.
5. Disconnect the three harness connections to the terminal block.
6. Disconnect the ground harness from the connection stud.
7. Feed the wire through the protective grommet.
8. Remove the four head screws to release the fan bracket and transfer to the replacement
blower.
9. To secure the igniter fan, repeat these steps in reverse order.
Removing the starter capacitor
Estimated replacement time: 5 m 10 minute lamp calibration
1. Remove the lamp.
2. Remove the front top lid.
3. Remove the rear top lid.
4. Use an adjustable wrench to remove the locking nut for mounting the capacitor.
5. Disconnect the two harness connections to the terminal block.
6. Remove the starter capacitor.
7. To install the starter capacitor, repeat these steps in reverse order.
Removing the liquid cooling reservoir
To replace or service the liquid cooling reservoir, it must be removed from the projector.
Estimated Replacement Time: 7.5 minutes
Parts and module replacement
Roadie 4K35 and 4K45 Service Manual
54
020-101694-03 Rev. 1 (01-2016)
Copyright
©
2016 Christie Digital Systems USA Inc. All rights reserved.