background image

 

 

 

 

July 2018 

443580508481 

Signify North America Corporation

 

200 Franklin Square Drive

 

Somerset, NJ  08873, USA

 

Phone:  855-486-2216

 

www.chloride-lighting.com

 

 

Signify Canada Ltd./Signify Canada Ltée. 
281 Hillmount Road,

 

Markham, ON, Canada  L6C 2S3

 

Phone:  800-668-9008

 

Top Assembly Drawing (For Reference only) 

 

                                                 Heads 

 
 
 
 
 

                                                             Batteries 
                                 Chassis assembly 

 

                      Lens 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Figure 8 

 
 

 

 
 

                                                                                                              

Batteries 

 
 
 

                               Control Board

 

 
 

                         
                            Membrane switch

 

 

                       
                       
 

Chassis assembly (back view) 

Figure 9 

Содержание HZ Series

Страница 1: ...d metal hardware to the enclosure Do not store or place flammable materials near lamp Install only grounded wiring systems to supply this equipment CAUTION ensure lamp heads are positioned so they are aimed below horizontal CLASS I DIV 2 HAZARDOUS LOCATION GROUPS A B C AND D ZONE 2 GROUPS IIC IIB AND IIA CLASS II DIV 2 GROUPS F AND G AND CLASS III DIV 1 AND 2 INSTALLATION AND OPERATING INSTRUCTION...

Страница 2: ...r is used a Connect WHITE wire to 24VDC Positive and 24VDC Negative b Use wire nuts for connection not supplied 7 Connect Battery connectors to the panel See Figures 4 and 6 8 Adjust head s as follows See Figure 3 a Rotation Loosen head nut and rotate head to desired position Retighten head nut An antirotation screw has been provided to ensure proper rotation b Angle Loosen thumb screw passing thr...

Страница 3: ...hone 855 486 2216 www chloride lighting com Signify Canada Ltd Signify Canada Ltée 281 Hillmount Road Markham ON Canada L6C 2S3 Phone 800 668 9008 INSTRUCTIONS OPERATION 1 Energize AC power to exit Unit will initiate normal power up sequence See page 4 Figure 3 Battery Connectors Figure 4 Figure 5 Figure 6 ...

Страница 4: ...ating condition Rapid Flash product performing an automatic or manually initiated diagnostic test Red LED indicator Single Flash battery fault Two Flashes lamp failure light bar failure EXIT signs Three Flashes charger fault Four Flashes transfer fault If more than one fault condition is present simultaneously the red LED will flash the indication pattern for each fault independently then repeat t...

Страница 5: ...hone 855 486 2216 www chloride lighting com Signify Canada Ltd Signify Canada Ltée 281 Hillmount Road Markham ON Canada L6C 2S3 Phone 800 668 9008 IR Remote Control optional is a hand held device that allows remote activation of diagnostic testing and silencing of the optional buzzer during fault conditions ...

Страница 6: ... VOLTAGE DROP 5 CM L X 22 USING THE ABOVE FORMULA AND HAVING CALCULATED THE CIRCULAR MILLS REQUIRED TO CARRY THE SPECIFIED LOAD AT A PREDETERMINED AND ALLOWABLE VOLTAGE DROP THE FOLLOWING CHART WILL IDENTIFY THE NECESSARY WIRE GAUGE FROM THE CORRESPONDING CIRCULAR MILL SIZE LISTED WIRE GAUGE AMPERE CAPACITY OHMS PER 1000 ft CIRCULAR MILL SIZE 12 20 1 586 6 530 10 25 9972 10 380 8 35 6271 16 510 6 ...

Страница 7: ... North America Corporation 200 Franklin Square Drive Somerset NJ 08873 USA Phone 855 486 2216 www chloride lighting com Signify Canada Ltd Signify Canada Ltée 281 Hillmount Road Markham ON Canada L6C 2S3 Phone 800 668 9008 Figure 7 ...

Страница 8: ...one 855 486 2216 www chloride lighting com Signify Canada Ltd Signify Canada Ltée 281 Hillmount Road Markham ON Canada L6C 2S3 Phone 800 668 9008 Top Assembly Drawing For Reference only Heads Batteries Chassis assembly Lens Figure 8 Batteries Control Board Membrane switch Chassis assembly back view Figure 9 ...

Отзывы: