Edge MAXX
Repair
7-9
Remove a link from the belt:
Use a pair of pliers to twist the tab of
one link until the tab can slide through
the hole in the next link.
Repeat this for the tab of the next link
so the first link can be removed.
Reconnect the belt by pushing the unused
tab through the unused hole.
NOTE:
Additional belt links
can be removed if necessary to
properly tension the belt.
Roll the belt back onto its pulleys.
Replace the cover(s) removed in Step 2.
WARNING
Never operate the unit unless
all safety covers are in place
and all safety equipment is
working correctly.
Start the unit and check the operation of
the clutch rollers.
4.
a)
b)
5.
6.
7.
8.
7.4 Transfer Section
The transfer section moves flatwork from
the inlet section to the spread section. While
the transfer section is mechanically simple,
various components require periodic adjustment
or replacement, or occasional repair. These
procedures include:
Transfer Clamp Check and Adjustment
Transfer Clamp Replacement
Transfer Clamp Eccentric Grooved
Bearing Adjustment
Transfer Clamp Grooved Bearing
Replacement
Transfer Belt Tension Adjustment
Transfer Belt Replacement
•
•
•
•
•
•
TOC
INDEX
Содержание Edge MAXX
Страница 1: ...EDGE MAXX Dual Input Large Piece Spreader Feeder INSTRUCTION MANUAL...
Страница 12: ......
Страница 102: ......
Страница 132: ......
Страница 196: ......
Страница 228: ...3038 010k Edge Maxx PL 14 This page intentionally left blank TOC INDEX PL TOC...
Страница 232: ...3038 010k Edge Maxx PL 18 This page intentionally left blank TOC INDEX PL TOC...
Страница 250: ......
Страница 252: ...SC 2 460V Motor Circuit TOC INDEX SC TOC...
Страница 255: ...Edge Maxx 3210 393d SC 5 This page intentionally left blank TOC INDEX SC TOC...
Страница 259: ...Edge Maxx 3210 393d SC 9 This page purposely left blank TOC INDEX SC TOC...
Страница 273: ......
Страница 274: ......
Страница 275: ......
Страница 276: ......
Страница 278: ......
Страница 280: ......