![Chenzhu CZLB series Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/chenzhu/czlb-series/czlb-series_user-manual_2596055001.webp)
CZ
.
CZLB
.
11(S)E
-
4
.
3
/
15
.
05
Maintenance
User
Manual
危险区
Surge Protective Devices
Caution
Please check whether the product type on the package accords
to the ordering contract;
Read this manual carefully before installation or use. If there is
something unclear ,you can dial our technic support hotline;
Prevent friction, avoid electrostatic;
Users are not allowed to dismantle or repair the SPD otherwise
it will induce malfunction.
Disassembly
Installation
Connections
5
4
Add: Building 6, 201 Minyi Road, Caohejing Hi-Tech Park
Songjiang New Industrial Park, Shanghai 201612, P.R. China
Tel : +86-21-64513350 Fax : +86-21-64846984
Email
:
chenzhu
@
chenzhu
-
inst
.
com
http://www.chenzhu-inst.com
(1).When using the SPD,you must have a reliable grounding.
(2).Check again wiring and polarity are correct before SPD energizing.
(3).The products were test strictly before leaving factory. If users find any
abnormalities in the module, please contact the nearest agent or our
company.
(4).In 5 years from the delivery date, if the product works improperly during
normal operation, we will repair or replace it without payment.
CZLB series
(1).The SPDs adopt screw terminals;
(2).The wires are single or multiple cables with a cross section area of
1
~
;
(3).The length of bared wire is about 8mm,locked tightly by M3 bolt.
2
2
.0mm 2.5mm
Wrie
W
4mm
≤
2
2
1.0mm <S <2.5mm
8mm
L
10mm
≤ ≤
1
2
3
2
1
(1)
.Insert a screwdriver (its edge length
≤
6mm)into the downside
metal lock of the SPD;
(2)
.Push the screwdriver upwards to open the metal clip;
(3)
.Take the SPD out of the guide rail.
This SPD is designed for mounting on 35mm DIN guide rail.
Installation according with the following steps:
(1).Make the upside of the SPD locked into the guide rail
;
(2).Push the downside of the SPD in the rail.