![ChemInstruments SS-HT-30 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/cheminstruments/ss-ht-30/ss-ht-30_operating-instructions-manual_2595913006.webp)
6 |
P a g e
Static Shear Tester Operating Instructions (SS-RT-10, SS-HT-8, SS-HT-30)
ASSEMBLY
Carefully remove the Shear Bank and Timer Box from the packaging and set them on a sturdy
bench top. Check the physical dimensions listed previously for the space required for the
instrument. As with any precision piece of laboratory equipment, it is preferable to locate the
Timer Box in an area where temperature and humidity are controlled to standard conditions of
72 ± 2°F and 50 ± 5% relative humidity.
High Temperature Shear Testers are designed to place only the Shear Bank in an oven. The
matching Timer Box is to be connected to the Shear Bank by the provided cable. Make sure the
appropriate cable is connected to the matching connector on the Shear Bank.
The ChemInstruments Shear Tester is now ready for calibration and use. Before proceeding
with calibrating the Shear Tester, it is advisable to become familiar with the Key Components of
the Shear Tester. These Key Components and a brief description of their function follow in the
next section.
Connect the power cord to its receptacle on the backside of the Timer Box. Complete the
connection by inserting the male end of the power cord into a convenient AC outlet. Notice that
the on/off power switch is located directly next to the power cord receptacle.
SS-HT-30
SS-HT-8