![ChemInstruments PT-1000 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/cheminstruments/pt-1000/pt-1000_operating-instructions-manual_2595911005.webp)
ASSEMBLY
Carefully remove the test frame/data acquisition assembly from the packaging and set it
on a sturdy bench top. Check the physical dimensions listed previously for the space
required for the instrument. As with any precision piece of laboratory equipment, it is
preferable to locate the Probe Tack Tester in an area where temperature and humidity
are controlled to standard conditions of 72 ± 2 degrees Fahrenheit and 50 ± 5% relative
humidity.
WARNING: Make sure the power source matches the requirements of
the Probe Tack Tester. Input voltage requirement will be labeled in
orange above power receptacle. Damage will occur if this unit is
plugged into the incorrect power supply.
Insert the annular ring in the test platform. Attach the probe to the threaded bolt on the
load cell.
Connect the power cord to its receptacle on the backside of the control cabinet.
Complete the connection by inserting the male end of the power cord into an
appropriate AC outlet. Notice that the on/off power switch is located directly beside the
power cord receptacle on the backside of the test frame.
Probe
Annular
Ring
Power
Switch
RS232
Connector
5 |
P a g e
Probe Tack Tester Operating Instructions (PT-1000)