Quick Start Guide: E10 2.0 RF/RFID Pedestals
Page 1 of 9
Installation Requirements
Minimum Required Hardware
(2) E10 2.0 Pedestals (for example, Single Aisle uses
1 A/N PSB and 1 P/N SSB units with the following)
(1) E10 Interpedestal Cable kit (CKP P/N 10083615)
(1) +24V DC Power Supply for RF-EAS readers
(1) +12V DC Power Supply for RFID readers
Note: All hardware items above must be ordered separately.
Small components are included in each pedestal box:
– RFID and RF On/Off Labels
– Screws for baseplate (2 anchor bolts) and Ad Panel
– Sounder Keyswitch (give to customer)
Specific antenna types (such as P/P or A/P type units) are
optional per site layout (see Supported Configurations):
• A/P Type antenna
• EU and FCC version are available. For ordering
info, see Region Specific Part Numbers in manual
• P/P Type antenna (also regional)
• (1+) RFID Install Kits
w/ 2x Coax Adapters (M-to-M, L-Shaped) to alter wiring for
Modified AP layouts (AA where existing cable meets reader)
ANYTHING ELSE?
Tools Required
Hammer Drill with bit set
Circular saw (whenever floor cuts are required)
Black Felt Marker
Field Equipment
DMS Version 1.91 or later (for TR7240 for compatibility) and a supported Web Browser, such as IE 11 or Chrome
RFIDEAS Tool Version 3.0.2 or later; and (optional) PuTTY
Network patch cord for RFID Reader connect; and RJ-45 Serial-to-USB Adapter for DMS connection
Physical Dimensions