Intelect® RPW
23
Before the unit can be installed and put into operation, certain
requirements must be fulfilled in the building where the unit is to
be operated.
Requirements of the Installation Location
Keep in mind the room and the installation location must be large
enough so that the unit can be operated from the front even if the
handpiece is positioned inconveniently.
There is no need to plug the power cord into an isolated circuit for
the proper function of this unit.
The unit must be installed so that there is no danger to the patient,
the operator, or other persons. Therefore, you must read the
Safety
Instructions on
pages 6-12
and the following information.
REQUIREMENTS FOR INSTALLATION
DANGER
WARNING
•
If the unit cannot be installed immediately after delivery, the unit
and its external components or accessory elements must be stored
in their original packaging in a dry place.
•
Do not store or operate the unit in a dusty environment.