manualshive.com logo in svg
background image

8 Bay Charging Locker

User Manual
MPN: CT-300114

18.2inches (462.7mm)

8.5inches (218.0mm)

Wall-Mounting PPL8

Template for Drilling Holes

Ø 0.39inches ( 10mm)

Ø6mm

1. Screw in Feet to the bottom of the locker.
Fix 2x L racks on the top of the product by using 2x 
M3 screws.
2. Mark holes on the wall with a pencil. Drill 2x 
Ø6mm holes in wall according to the marks.
3. Fix 2x screw studs in holes.
4. Fix 2x M4 screws to secure the unit in place.

3. Fix 2x L racks on the 
bottom of the product by 
using 2x M3 screws.

4. Mark the holes on wall. 
Drill 2x Ø6mm holes in 
the wall according to the 
marks.

Option A: Table Mount/Wall Secure

Option B: Wall Mount

2

3

4

1. Drill 4x Ø10mm holes (Suggested: 1.6m/63in 
height) on wall according to the supplementary 
drawing. Fix 4x screw studs and 4x screws into 
the wall (not included).

2. Lift 5mm over screws for hanging the product 
on the wall.

*Suggested as a
TWO-PERSON Job.

2

      1

60cm

Ø6mm

4

5

6

3

5. Fix 2x screw studs in holes.
6. Fix 2x M4 screws to secure the unit in place.

P1

1

Содержание CT-300114

Страница 1: ...M4 screws to secure the unit in place 3 Fix 2x L racks on the bottom of the product by using 2x M3 screws 4 Mark the holes on wall Drill 2x Ø6mm holes in the wall according to the marks Option A Table Mount Wall Secure Option B Wall Mount 2 3 4 1 Drill 4x Ø10mm holes Suggested 1 6m 63in height on wall according to the supplementary drawing Fix 4x screw studs and 4x screws into the wall not include...

Страница 2: ...place 3 Fix 2x L racks on the bottom of the product by using 2x M3 screws 4 Mark the holes on wall Drill 2x Ø6mm holes in the wall according to the marks Option A Table Mount Wall Secure Option B Wall Mount 2 3 4 1 Drill 4x Ø10mm holes Suggested 1 6m 63in height on wall according to the supplementary drawing Fix 4x screw studs and 4x screws into the wall not included 2 Lift 5mm over screws for han...

Страница 3: ...b screw x 6 6 Connect power cord with the extension cord 2 Open the back door on the pole by unscrewing the screws x2 on the door 3 Fix the locker on floor stand with screws x6 P3 4 Connect power cord with the extension cord in the Locker Body 5 Close and fix the back door by replacing the screws ...

Страница 4: ...et box will pop open and will need to be closed If the password is lost look to page 6 for the hard reset instructions Creating a new Admin Password ensures that your locker is accessible by your staff only It is advised to save your password in a digital document in your company s cloud server Administrative Mode Default Password 88888888 Please change it before implementing the locker Adjust the...

Страница 5: ...control box door with key provided 2 Unlock the door by pressing the button on the lock 3 Open the cable clip 2 4 Unplug Type C USB Cable 5 Unscrew the cable clip and take out the cable through the hole 6 Replace cable clip s P5 3 4 5 ...

Страница 6: ...e away from strong volatile solvents or chemicals such as thinner benzene alcohol pesticide rubber or vinyl plastic etc which may lead to deterioration or damage to your devices Specifications Important Information Usage Notes Reset to factory admin password Reset to Factory Admin Password Main Phone Number 888 250 8756 Customer Service support chargetechsolutions com Sales Support sales chargetec...

Отзывы: