Suggested Tools:
Wrench and/or Ratchet Set
Approximate assembly time is 5-10 minutes
Assembly Instructions
1E
Chapin Spreader Operator’s Manual - English
WARNING: IMPROPER USE OR FAILURE TO FOLLOW INSTRUCTIONS CAN RESULT
IN PRODUCT FAILURE OR INJURIES. FOR SAFE USE OF THIS PRODUCT YOU MUST
READ AND FOLLOW ALL INSTRUCTIONS BEFORE USING.
Do not allow anyone to operate the broadcast spreader without proper instructions. Do not
permit children to operate the broadcast spreader. Wear protective eyewear and gloves when
handling and applying lawn and garden chemicals. Read the chemical label instructions and
warnings for handling and applying the chemicals you plan to spread – application settings
provided are only a guideline.
Auger is designed to work in forward motion. Excessive reverse motion could cause
binding. If resistance is felt while pulling spreader backwards, stop and clear salt
from auger.
WARNING
HANDLE ASSEMBLY
• Assemble handle to uprights with Hex bolts and M6 nuts.
• Tighten M6 nuts completely.
Note:
If you frequently store your spreader with the
handle down, optional thumb screws are provided for
faster disassembling.