#ONTROL "OARD 2EPLACEMENT
-ODEL +$##
4O REDUCE THE RISK OF ).*529 OR $%!4(
z
$ISCONNECT ALL POWER "%&/2% INSTALLING OR SERVICING OPERATOR
z
3EE MANUAL PRIOR TO SERVICING REGARDING MAINTENANCE AND REQUIRED SAFETY TESTING
7!2.).'
4HIS PRODUCT CAN EXPOSE YOU TO CHEMICALS INCLUDING LEAD WHICH ARE KNOWN TO THE 3TATE OF #ALIFORNIA TO CAUSE CANCER OR BIRTH DEFECTS
OR OTHER REPRODUCTIVE HARM &OR MORE INFORMATION GO TO WWW07ARNINGSCAGOV
)NTRODUCTION
4HIS KIT PROVIDES A REPLACEMENT CONTROL BOARD FOR ALL ,IFT-ASTER !# GATE OPERATORS 3LIDE GATE OPERATORS WITH THE NEW CONTROL BOARD REQUIRE A
MINIMUM OF
TWO
EXTERNAL MONITORED ENTRAPMENT PROTECTION DEVICES TO FUNCTION ONE IN THE OPEN DIRECTION AND ONE IN THE CLOSE DIRECTION 3EE 6ERIFY 0ROPER %NTRAPMENT
0ROTECTION SECTION
2EPLACE THE #ONTROL "OARD
-AKE SURE THE !# POWER SWITCH ON THE OPERATOR IS /&&
4URN OFF THE !# POWER FROM THE MAIN POWER SOURCE CIRCUIT BREAKER
2EMOVE THE OPERATOR COVER OR ELECTRICAL BOX COVER TO ACCESS THE CONTROL BOARD
$ISCONNECT ALL WIRING FROM THE CONTROL BOARD AND LABEL THE LOCATION FOR REWIRING TO THE NEW CONTROL BOARD
2EMOVE THE CONTROL BOARD FROM THE OPERATOR
)NSTALL THE NEW CONTROL BOARD
2ECONNECT ALL WIRING TO THE NEW CONTROL BOARD SEE
#ONTROL "OARD /VERVIEW
SECTION
4URN ON THE !# POWER FROM THE MAIN POWER SOURCE CIRCUIT BREAKER
4URN ON THE !# POWER SWITCH
0ROCEED TO THE FOLLOWING SECTIONS TO COMPLETE ADJUSTMENT AND SETUP OF THE OPERATOR
Содержание Elite K1D6761-1CC
Страница 31: ...4HIS PAGE INTENTIONALLY LEFT BLANK ...