CGEO-SG5
Rebar VW Strain Gauge 7
CGEO INTERNATIONAL LIMITED
Installation Manual
Instrument Cables
Instrument Cable
Reinforcing Rebar
or Strand
Reinforcing Rebar
or Strand
Wire Tie
(2 places)
Rebar Strain Gauge
Rebar Strain Gauge
(3 places, 120° apart)
Wire Tie
Tied to Reinforcing Rebar
Tied to Reinforcing Rings
Figure 5 - Model CGEO-SG5 "Sister Bar" Installation Detail
2.3. Cable Installation
As noted in the installation sections, route the instrument cables along the structural rebar and
tie off using nylon cable ties every 2-3 feet (1 meter) to secure. Outside of the instrumented
structure, the cable should be protected from accidental damage caused by moving equipment or
other construction activity.
Cables may be spliced to lengthen them, without affecting gage readings. Always waterproof the
splice completely, especially when embedding within the concrete, preferably using an epoxy
based splice kit such the 3M Scotchcast , model 82-A1. These kits are available from the factory.