CET Electric Technology
I
Table of Contents
1.3 iMeter 6’s Application in Power and Energy Management Systems
.........................................................
2.5.2 3-Phase 4-Wire Wye Direct Connection with 3CTs or 4CTs
............................................................
2.5.3 3-Phase 4-Wire Wye with 3PTs and 3CTs or 4CTs
...........................................................................
2.5.5 3-Phase 3-Wire Grounded Wye
2.5.6 3-Phase 3-Wire Direct Delta Connection with 3CTs or 2CTs
..........................................................
2.5.7 3-Phase 3-Wire Open Delta with 2PTs and 3CTs or 2CTs
...............................................................
2.6.2 Ethernet Port (10/100BaseT)
2.10 Energy Pulse Output Wiring
3.1.1 Front Panel LED Indicators
3.2.2 Configure iMeter 6’s IP Address
...................................................................................................
4.2.3 Interval Energy Measurements
....................................................................................................
4.2.6 Max./Min. per Demand Period
....................................................................................................
4.3.2 Power Quality Parameters
4.3.3 Unbalance and Sequence Components
.......................................................................................
4.3.5 Supply Voltage Dips/Swells and Interruptions
.............................................................................