2-1-1
U29PHSMEN
STANDARD MAINTENANCE
Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head) using
90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ Recording model only
* B86 ------ Not used in 2 head model.
H: Hours
: Cleaning
I
: Replace
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 H
2,000 H
3,000 H
4,000 H
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B587
Tension Lever Assembly
I
I
B31
ACE Head Assembly
I
B573, B574
Reel S, Reel T
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
*B73
FE Head
I
*B86
F Brake Assembly (HI)
I
I
B133
Idler Assembly (HI)
I
I
B410
Pinch Arm Assembly
I
I
B414
M Brake (SP) Assembly (HI)
I
I
B416
M Brake (TU) Assembly (HI)
I
I
B525
LDG Belt
I
I
Содержание GEB100
Страница 22: ...1 8 3 1 8 4 HG221SCM1 Main 1 5 Schematic Diagram...
Страница 23: ...Main 2 5 Sensor Schematic Diagrams 1 8 5 1 8 6 HG221SCM2...
Страница 24: ...Main 3 5 Schematic Diagram 1 8 7 1 8 8 HG221SCM3...
Страница 25: ...Main 4 5 Jack Schematic Diagrams 1 8 9 1 8 10 HG221SCM4...
Страница 29: ...1 8 17 1 8 18 Jack CBA Top View Jack CBA Bottom View BHG470F01014C...
Страница 35: ...1 13 1 HG221FEX EXPLODED VIEWS Front Panel A1X...
Страница 37: ...1 13 3 HG221PEX Packing Some Ref Numbers are not in sequence X2 X3 X20C X20B X20A X1 X4 S1 Unit S3 A14 S2 S2...
Страница 69: ...GEB100 HG221ED 2004 04 15...