![CE+T Power TSI VEDA Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/ce-t-power/tsi-veda/tsi-veda_user-manual_2577185020.webp)
9.4.1 Positioning
9.4.2 Cabling
Note: Do not block the airflow through the top of the cabinet.
Cables are run through the top of the cabinet or the bottom.
The top cover is possible to split in three parts to facilitate cabling.
The top cover has support to strap the cables with nylon tie straps.
Ground
PE
DC Input (X1)
Alarm (X3, X5, X6)
AC Output (X4)
AC Output distribution (X4)
DC Input (X11 to X18) Alarm (X3) / Digital in (X5),
Remote ON/OFF (X6), Bulk AC output (X4)
Internal DC distribution (Q1-Q6)
CanDis shelf (Option)
Phase 1
Inverter sub rack
Inverter modules
PLEASE ! Refer to the technical drawings received with
your cabinet for exact positioning!
20
– TSI VEDA – User manual – v7.1