![CE+T Power TSI VEDA Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/ce-t-power/tsi-veda/tsi-veda_user-manual_2577185019.webp)
9. Installation of cabinet (A la Carte)
9.1 Unpacking the system
The cabinet is packed in a wooden box.
The packing material of the TSI system is recyclable.
Transport the cabinet in the box on the pallet.
9.2 Raising the cabinet
The top cover fixing bolts must NOT be replaced with lifting eye bolts. Mark and remove modules from the cabinet, that the
modules can be replaced in the same slot, and raise the cabinet on location.
9.3 Fixing the cabinet to the floor
The cabinet is fixed through the base of the cabinet.
Remove lowest front cover to gain access to the fixing holes.
Max screw diameter is 22mm. See Hole pattern, foot print. for foot print measurements.
9.4 Electrical installation
All cables shall be halogen free and rated min 90 deg C.
Wire all positions for future expansion
Output AC / Input DC / Signal cables shall be separated
Cable crossings shall be done in 90 deg angles
Empty inverter positions shall be covered with blanks
19
– TSI VEDA – User manual – v7.1