![CE+T Power Bravo 10 - 48/230 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/ce-t-power/bravo-10-48-230/bravo-10-48-230_user-manual_2577177018.webp)
7. Installation of Bravo 10 - Shelf
•
Read safety instructions prior starting any work.
•
Do NOT attempt to use lifting eyes to erect the cabinet.
•
System is preferable handled without modules.
•
Pay attention to the module position, make sure that modules are repositioned in the same slot.
•
In three phase systems, the modules are configured as per phase 1, phase 2 and phase 3.
•
As long as the system is not in operation, make sure that modules from one phase are not mixed with modules
from another phase. (When the system is running, modules can be moved from one phase to another without
issue.)
7.1 Mounting kit for Bravo 10 - shelf
The fixing brackets, together with the sliders, allow for different cabinet depths.
1
Fixing brackets - 4 Nos
2
Slider - 2 Nos
3
Mounting screws - 12 Nos
4
Cage nuts - 12 Nos
Assemble the sliders and adjust the length to suit
the mounting depth.
Fix cage nuts (
4
) in the cabinet front and rear
frame of the left and the right side.
Fix the left and right slider of the cabinet with the
supplied screws (
3
).
Installation of Bravo 10 - Shelf
18
- Bravo 10 - 48/230 - User manual - v1.2
Содержание Bravo 10 - 48/230
Страница 43: ......