background image

Messenger SMB CAN

4. Connect Optional Solar Panel

12V solar panels are shipped as standard. If 24V is required, please 

contact 

[email protected]

1. Solar panels should be installed in an unobstructed location, as 

high as safely possible.

2. Panel should be exposed to as much natural light as possible.

3. In the northern hemisphere, place panels at a 45-degree angle 

to southern exposure for best performance.

4. After panel is securely paced, connect the cable to the 

corresp/- terminals of the host unit’s battery via the 

attached ring terminals. 

Note: Take care when wiring to power to prevent discharge. 

5. Final Systems Check

1. Return to the interior of the SMB case for a final systems check to ensure normal functionality listed 

below. 

6. Connect to RemoteIQ™

Connect to your login page to begin accessing your unit’s remote functionality as well as configuring your run 

parameters.. 

Configuration Sheets and Manuals Are Available at Cattron.com

‘System’ light blinking green

‘GPS’ light no longer blinking once signal is acquired

‘Cell Reg’ light blinking red only when transmitting data

‘Port 2’ status determined based on accessory utilization

‘Cell Status’ light not illuminated

‘Port 3’ status determined based on accessory utilization

‘CAN/Jbus’ light not illuminated w/control panel powered

‘Signal Strength’ will indicate in a pattern of 1 to 5 blinks

2. Normal status for the solar controller will show all three indicators: solar panel icon (system charging), 

battery icon (in service status), and light bulb icon (load turned on – Messenger is powered). 

3. Close the lid, latch securely and ensure pressure valve is tightened to reestablish weatherproof integrity.

Nimble: 9M01-9337-A001 | June 2022

Отзывы: