6 - MAINTENANCE
STORAGE
Preparing for storage
The following procedure applies when the machine is to be stored for a month or more. Store the machine on flat,
level ground, inside a building or, if not possible, outside and covered with a tarpaulin. Before storing the machine,
carry out the following operations:
1.
Clean the machine.
2.
Make sure that the machine has no damaged or
missing parts. Replace them if necessary.
3.
Retract the cylinder rods as for as possible and
lower the boom until the attachment is resting on the
ground. Lower the dozer blade (if equipped) to the
ground.
4.
Grease the machine thoroughly. The exposed sur-
faces of the cylinder rods should be greased or cov-
ered with a protective film. Consult your CASE CON-
STRUCTION Dealer.
NOTE:
When the machine resumes service, the film will
disappear automatically.
5.
While the engine is still warm, drain the oil sump,
replace the oil filter and fill with specified oil. Check
the oil level and add more if necessary.
6.
Clean or replace the air filter element.
7.
Check the level of coolant solution. If the machine
is within 100 hours of the next scheduled coolant
change, change the coolant now.
8.
Remove the batteries, clean the battery housings
and make sure not to leave any traces of acid. Store
the batteries safely in a cool and dry location, where
the temperature is higher than
0 °C
(
32.0 °F
) or dis-
connect the cable from the negative (-) terminal.
9.
Paint any areas where the paintwork is not good.
10.
Plug the air filter inlet and the exhaust pipe.
11.
Remove the ignition key and place a "Do not operate"
label on the right-hand control arm and then place the
function cancellation lever in the raised position.
12.
Lock the hoods, side doors and the cab door.
6-90
Содержание CX145C SR
Страница 6: ......
Страница 18: ...1 GENERAL INFORMATION 1 12 ...
Страница 28: ...2 SAFETY INFORMATION 50C06B9B 3 See chapter Illustration of decals for the functions of decals 2 10 ...
Страница 29: ...2 SAFETY INFORMATION E5054225_TU 4 2 11 ...
Страница 69: ...3 CONTROLS INSTRUMENTS System display and function control panel MUC8LU 034Z 1 MUC8LU 044Z 2 3 19 ...
Страница 132: ...3 CONTROLS INSTRUMENTS 3 82 ...
Страница 160: ...4 OPERATING INSTRUCTIONS 4 Operate the arm control to unhook the tool KKZVLU 024A 14 4 28 ...
Страница 180: ...4 OPERATING INSTRUCTIONS 4 48 ...
Страница 206: ...6 MAINTENANCE Offset boom pin 10 07C803C9 17 6 16 ...
Страница 207: ...6 MAINTENANCE Arm backhoe bucket 375EFD72 18 AB1F527A 19 6 17 ...
Страница 294: ...8 SPECIFICATIONS Working range with monobloc boom 2917308C 4 See next page for the values 8 10 ...
Страница 296: ...8 SPECIFICATIONS Working range with offset boom Offset zero 4F6C0DD8 5 See next page for the values 8 12 ...
Страница 298: ...8 SPECIFICATIONS Offset maximum left EACB5F36 6 See next page for the value 8 14 ...
Страница 300: ...8 SPECIFICATIONS 8 16 ...