Step 5 — Field Fabricate Ductwork
Cabinet return-air static pressure (a negative condition) shall
not exceed 0.35 in. wg (87 Pa) with economizer or 0.45 in. wg
(112 Pa) without economizer.
For vertical ducted applications, secure all ducts to roof curb
and building structure.
Do not connect ductwork to unit.
Fabricate supply ductwork so that the cross sectional dimen-
sions are equal to or greater than the unit supply duct opening
dimensions for the first 18 in. (458 mm) of duct length from
the unit basepan.
Insulate and weatherproof all external ductwork, joints, and
roof openings with counter flashing and mastic in accordance
with applicable codes.
Ducts passing through unconditioned spaces must be insulated
and covered with a vapor barrier.
If a plenum return is used on a vertical unit, the return should
be ducted through the roof deck to comply with applicable fire
codes.
Horizontal applications require a minimum clearance to com-
bustible surfaces of 1-in. (25 mm) from duct for first 12-in.
(305 mm) away from unit. Vertical applications do not require
a minimum clearance around ductwork.
Outlet grilles must not lie directly below unit discharge.
Step 6 — Rig and Place Unit
Keep unit upright and do not drop. Spreader bars are not re-
quired if top crating is left on unit. Rollers may be used to
move unit across a roof. Level by using unit frame as a refer-
ence. See Table 5 (on page 11) and Fig. 10 for additional infor-
mation.
Lifting holes are provided in base rails as shown in Fig. 10. Re-
fer to rigging instructions on unit.
Rigging materials under unit (cardboard or wood) must be re-
moved PRIOR to placing the unit on the roof curb.
When using the standard side drain connection, ensure the red
plug in the alternate bottom connection is tight. Do this before
setting the unit in place. The red drain pan can be tightened
with a
1
/
2
-in. square socket drive extension. For further details,
see Step 10 — Install External Condensate Trap and Line on
page 17.
Before setting the unit onto the curb, recheck gasketing on
curb.
POSITIONING ON CURB
Position unit on roof curb so that the following clearances are
maintained:
1
/
4
-in. (6.4 mm) clearance between the roof curb
and the base rail inside the front and rear, 0.0-in. clearance be-
tween the roof curb and the base rail inside on the duct end of
the unit. This will result in the distance between the roof curb
and the base rail inside on the condenser end of the unit being
approximately
1
/
4
-in. (6.4 mm).
Although unit is weatherproof, guard against water from higher
level runoff and overhangs.
After unit is in position, remove the compressor access panel.
Holding the blocking between compressors with one hand, cut
the strapping. Carefully remove the blocking without damag-
ing tubing, wiring, or controls. Remove the strapping and re-
place the access panel.
Remove all shipping materials and top skid. Recycle or dispose
of all shipping materials.
CAUTION
PROPERTY DAMAGE HAZARD
Failure to follow this caution may result in damage to roofing
materials.
Membrane roofs can be cut by sharp sheet metal edges. Be
careful when placing any sheet metal parts on such roof.
WARNING
PERSONAL INJURY HAZARD
Failure to follow this warning could cause personal injury.
For vertical supply and return units, tools or parts could drop
into ductwork and cause an injury. Install a 90 degree turn in
the return ductwork between the unit and the conditioned
space. If a 90 degree elbow cannot be installed, then a grille
of sufficient strength and density should be installed to pre-
vent objects from falling into the conditioned space. Due to
electric heater, supply duct will require 90 degree elbow.
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage.
All panels must be in place when rigging. Unit is not designed
for handling by fork truck when packaging is removed.
If using top crate as spreader bar, once unit is set, carefully
lower wooden crate off building roof top to ground. Ensure
that no people or obstructions are below prior to lowering the
crate.
Содержание WeatherMaker 50TCQ*08
Страница 4: ...4 Fig 2 Unit Dimensional Drawing 08 and 09 Size Units ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing 08 and 09 Size Units cont ...
Страница 6: ...6 Fig 3 Unit Dimensional Drawing 12 Size Unit ...
Страница 7: ...7 Fig 3 Unit Dimensional Drawing 12 Size Unit cont ...
Страница 19: ...19 Fig 25 Typical 50TCQ Control Wiring Diagram Sizes 08 09 ...
Страница 20: ...20 Fig 26 Typical 50TCQ Control Wiring Diagram Size 12 ...
Страница 21: ...21 Fig 27 50TCQ 08 09 Power Wiring Diagram ...
Страница 22: ...22 Fig 28 Typical 50TCQ 12 Power Wiring Diagram 208 230 v 3 Phase 60Hz Unit Shown ...
Страница 45: ......