Installing the VVT Zone II
VVT Zone II Controller
CARRIER CORPORATION ©2019
Installation and Start-up Guide
All rights reserved
11
To wire the controller for power
1
To access the screw terminal connectors, lift up the controller's cover by pulling the tabs located on both
sides of the controller's left mounting bracket.
2
Remove power from the power supply.
3
Pull the screw terminal connector from the controller's power terminals labeled
Gnd
and
24 Vac
.
4
Connect the transformer wires to the screw terminal connector.
5
Apply power to the power supply.
6
Measure the voltage at the VVT Zone II’s power input terminals to verify that the voltage is within the
operating range of 21.6–26.4 Vac.
7
Connect a 4-inch (10.2 cm) wire from
Gnd
to the control panel.
8
Insert the screw terminal connector into the VVT Zone II's power terminals.
9
Verify that the
Power
LED is on and the
Run
LED is blinking.
Содержание VVT Zone
Страница 103: ......