
Installing the MPC Open XP
MPC Open XP
MPC Open XPIO48/816
CARRIER CORPORATION ©2019
Installation and Start-up Guide
All rights reserved
25
Wiring communication
1
Turn off the MPC Open XP's power.
2
Wire the TruVu™ ET Display's
RS485
connector to the <ALCProduct>'s
Rnet
port,
Gnd
to
Gnd
,
+
to
Rnet +
,
-
to
Rnet -
using 2-conductor 22 AWG wire with a maximum distance of 500 feet (152 meters).
NOTE
Verify the <ALCProduct>'s
Enhanced Access
DIP switch is set to
Off
.
3
Turn on the MPC Open XP's power.
Installing the MPC Open XP into an i-Vu® Control System
You must complete the following procedures to successfully install your MPC Open XP into an i-Vu® Control
System. Use the Help in the referenced software for detailed descriptions of these procedures.
EquipmentBuilder or Snap
1
Use EquipmentBuilder or Snap to create control program(s) for your MPC Open XP.
2
If applicable, print the Sequence of Operation, which includes the points list.
NOTE
You can create a points list under
Reports
in the i-Vu® application or Field Assistant after installing
your control program.
This Installation Guide
1
Prepare a wire list using the points list. Refer to
Appendix A
(page 34).
2
Use the wire list and the following installation procedures to install and wire I/O points to your MPC Open XP
and expanders, if applicable.