![Carrier Comfort 50VT C Series Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/carrier/comfort-50vt-c-series/comfort-50vt-c-series_installation-instructions-manual_2563522001.webp)
1
50VT---C
Comfort
t
14 SEER Single---Packaged Heat Pump
System with Puron
(R---410A) Refrigerant
Single Phase 2---5 Nominal Tons (Sizes 24---60)
Three Phase 3---5 Nominal Tons (Sizes 36---60)
Installation Instructions
IMPORTANT
: Effective January 1, 2015, all split system and
packaged air conditioners must be installed pursuant to applicable
regional efficiency standards issued by the Department of Energy.
NOTE
:
Read the entire instruction manual before starting the
installation.
NOTE
:
Installer: Make sure the Owner’s Manual and Service
Instructions are left with the unit after installation.
TABLE OF CONTENTS
PAGE
SAFETY CONSIDERATIONS
1
. . . . . . . . . . . . . . . . . . . . . . . . .
INTRODUCTION
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RECEIVING AND INSTALLATION
2--9
. . . . . . . . . . . . . . . . . .
Check Equipment
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Identify Unit
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inspect Shipment
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Provide Unit Support
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Roof Curb
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Slab Mount
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Provide Clearances
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Rig and Place Unit
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inspection
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Rigging/Lifting of Unit
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Select and Install Ductwork
7
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Configuring Units to Downflow (Vertical) Discharge
7
. . . . .
Provide for Condensate Disposal
8
. . . . . . . . . . . . . . . . . . . . . .
Install Electrical Connections
8
. . . . . . . . . . . . . . . . . . . . . . . . .
High--Voltage Connections
8
. . . . . . . . . . . . . . . . . . . . . . . . .
Special Procedures for 208--V Operation
9
. . . . . . . . . . . . . . .
Control Voltage Connections
9
. . . . . . . . . . . . . . . . . . . . . . . .
Standard Connections
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Transformer Protection
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Accessory Electric Heaters Installation
9
. . . . . . . . . . . . . . . .
Sequence of Operation
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
PRE--START--UP
17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
START--UP
17--20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Checking Cooling & Heating Control Operation
17
. . . . . . . .
Check for Refrigerant Leaks
17
. . . . . . . . . . . . . . . . . . . . . . . . .
Start--Up Adjustments
18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Checking & Adjusting Refrigerant Charge
18
. . . . . . . . . . . .
Indoor Airflow & Airflow Adjustments
18
. . . . . . . . . . . . . .
Continuous Fan Operation
19
. . . . . . . . . . . . . . . . . . . . . . . .
Defrost Control
20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Defrost
20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
MAINTENANCE
28--33
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Air Filter
28
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Indoor Blower and Motor
28
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Outdoor Coil, Indoor Coil, & Condensate Drain Pan
31
. . . . . .
Outdoor Fan
31
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Electrical Controls and Wiring
31
. . . . . . . . . . . . . . . . . . . . . . .
Refrigerant Circuit
31
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Indoor Airflow
31
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Metering Devices-- TXV & Piston
31
. . . . . . . . . . . . . . . . . . . .
A170030
Fig. 1 -- Unit 50VT--C
Pressure Switches
31
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Loss of Charge Switch
32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
High Pressure Switch
32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copeland Scroll compressor (Puron Refrigerant)
32
. . . . . . . . .
Refrigerant System
32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Refrigerant
32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compressor Oil
33
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Servicing Systems on Roofs with Synthetic Materials
33
. . . .
Liquid Line Filter Drier
33
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Puron
R
(R--410A) Refrigerant Charging
33
. . . . . . . . . . . . .
System Information
33
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Loss of Charge Switch
33
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Check Defrost Thermostat
33
. . . . . . . . . . . . . . . . . . . . . . . . .
TROUBLESHOOTING
33
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
START--UP CHECKLIST
33
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
SAFETY CONSIDERATIONS
Installation and servicing of this equipment can be hazardous due
to mechanical and electrical components. Only trained and
qualified personnel should install, repair, or service this equipment.
Untrained personnel can perform basic maintenance functions such
as cleaning and replacing air filters. All other operations must be
performed by trained service personnel. When working on this
equipment, observe precautions in the literature, on tags, and on
labels attached to or shipped with the unit and other safety
precautions that may apply.
Follow all safety codes. Wear safety glasses, protective clothing,
and work gloves. Use quenching cloth for brazing operations.
Have a fire extinguisher available. Read these instructions
thoroughly and follow all warnings or cautions included in
Содержание Comfort 50VT C Series
Страница 3: ...3 Fig 2 24 30 Unit Dimensions 50VT C...
Страница 4: ...4 Fig 3 36 60 Unit Dimensions 50VT C...
Страница 11: ...11 A150518 Fig 12 Connection Wiring Schematics 208 230 1 60 50VT C...
Страница 12: ...12 A150519 Fig 12 Cont Ladder Wiring Schematics 208 230 1 60 50VT C...
Страница 13: ...13 A150520 Fig 13 Connection Wiring Schematics 208 230 3 60 50VT C...
Страница 14: ...14 A150521 Fig 13 Cont Ladder Wiring Schematics 208 230 3 60 50VT C...
Страница 15: ...15 A150522 Fig 14 Connection Wiring Diagram 460 3 60 50VT C...
Страница 16: ...16 A150523 Fig 14 Cont Ladder Wiring Diagram 460 3 60 50VT C...