CHECKLIST—INSTALLATION
LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
VENT PIPING
Termination Location
________
Roof or Sidewall
________
Vent Pipe Length
________
Vent Pipe Elbow Quantity
________
Pipe Diameter Determined from Sizing Table
________
Pipe Sloped To Furnace
Pipe Insulation
________
Over Ceilings
________
Low-Ambient Exposed Pipes
Condensate Drain
________
Unit Level or Pitched Forward
________
Internal Tubing Connections Free of Kinks
and Traps
________
External Drain Connection Leak Tight and
Sloped
________
Condensate Trap Primed before Start-Up
________
Heat Tape Installed if Required
CHECKLIST—START-UP
________
Gas Input Rate (Set Within 2 percent of
Rating Plate)
________
Temperature Rise Adjusted
Thermostat Anticipator
________
Anticipator Setting Adjusted or
________
Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
________
Primary Limit
________
Pressure Switch