13
ENG
"humiFog direct" +0300073EN rel. 1.2 - 02.05.2019
3. DISTRIBUTION SYSTEM INSTALLATION
3.1 Blower unit installation
The humiFog Direct system works by connecting the cabinet to a
number of blower units installed directly in the room to be humidified
and/or cooled.
The following simple rules must be kept in mind when installing the
blower units:
•
the minimum flow-rate that can be atomised in the room is 8 l/h
(irrespective of the size of the pump). The minimum number of blower
units must therefore be defined based on the number and size of the
chosen nozzles.
The maximum numbers of blower units that can be connected to a
cabinet are:
•
12 blower units with 2 nozzles
•
6 blower units with 4 nozzles
•
3 blower units with 8 nozzles
The blower units must be suitably positioned so as to allow complete
absorption of the sprayed water. Consequently it is recommended to
install the blowers a due distance apart, at a sufficient height from the
floor and with free space at the front without obstacles.
The blower units can be mounted either on the wall or on the ceiling.
For a correct installation, see the example in Fig. 3.a or contact Carel for
different temperature and humidity conditions.
Fig. 2.h
2.4 Changing the oil cap
During installation, before starting the unit, remember to replace the red
oil cap (A) on the pump with the yellow one (B) supplied. The red cap is
closed and is only used for transport. The yellow cap has a vent opening
and is used for normal operation of the system. The yellow cap is supplied
inside the cabinet, tied to the high pressure gauge (see the image below).
A
B
Fig. 2.i
0.5 ÷ 1m
≥ 5m
light
light
≥ 5m
≥ 4m
≤ 4m
SI
rH = 40% T = 25 °C
SI
NO
SI
NO
SI
NO
NO
≤ 10°
≤ 10°
Fig. 3.a
Содержание humiFog direct DLA02DF000
Страница 2: ......
Страница 4: ...4 ENG humiFog direct 0300073EN rel 1 2 02 05 2019...
Страница 6: ...6 ENG humiFog direct 0300073EN rel 1 2 02 05 2019...
Страница 46: ...46 ENG humiFog direct 0300073EN rel 1 2 02 05 2019 Note...
Страница 47: ......