■ Procedure
1. Release the harness from the wire saddles to remove the folding position adjustment back clutch.
• 1 Connector
• 1 E-rings
1x
1x
■ Actions after Replacement the Parts
1. Clear parts counter.
Service Mode > COPIER > COUNTER > DRBL-2 > PF-CL2
Removing the Through/Fold Branch Solenoid(SOL2)
■ Preparation
1. Open the front cover.
“Open the Front cover” on page 64
2. Open the feed guide.
“Open the Feed Guide” on page 65
3. Draw out the folding unit.
“Drawing out the Folding Unit” on page 71
4. Remove the front lower cover.
“Removing the Front Lower Cover” on page 66
■ Procedure
1. Release the harness from the wire saddle to remove the Through/Fold Branch Solenoid Unit.
• 1 Connector
• 2 Screws
• 1 E-rings
1x
2x
2x
4. Disassembly/Assembly
74
Содержание Paper Folding Unit-J1
Страница 1: ...Revision 3 0 Paper Folding Unit J1 Service Manual ...
Страница 9: ...Product Overview 1 Outline 4 Specifications 5 Names of Parts 9 ...
Страница 18: ...Technical Explanation 2 Basic Configuration 13 Controls 25 Upgrading 55 ...
Страница 30: ...4 Delivery operation Feeds the paper to the finisher through the delivery path 2 Technical Explanation 24 ...
Страница 62: ...Periodical Service 3 List of Work for Scheduled Servicing 57 ...
Страница 73: ... Procedure 1 Remove the screws 2 Screws 2x 4 Disassembly Assembly 67 ...
Страница 95: ...Adjustment 5 Overview 90 Major Adjustment 93 Action on parts replacement 105 ...
Страница 155: ...13 Return the jam recovery map and close the front upper cover 6 Installation 149 ...
Страница 158: ...APPENDICES Service Tools 153 General Circuit Diagram 154 ...