Points to Note About Turning Off the Main Power Switch
This equipment does not have a main power switch, but it has only a leakage breaker.
This equipment is powered when the main power switch of the host machine is turned on.
The leakage breaker detects overcurrent and power leakage.
MEMO:
Explain to the customer that the leakage breaker must be checked once or twice a month and
the result must be recorded.