Connection Check
1. Connect the Power Cord to the plug of this
equipment.
CAUTION:
Be sure to use an outlet of a system different from that
of the host machine.
1x
2. Connect the downstream equipment.
CAUTION:
For details on the procedure for connecting the
downstream equipment, refer to the Installation
Procedure included in the package of the downstream
equipment.
3. Connect the power plug to the outlet of the host
machine.
4. Turn ON the main power switch of the host machine
( Excludes imagePRESS C10000VP/C8000VP
series).
If a message prompting the user to update the version
appears, press [Update] to automatically update the
version of this equipment.
NOTE:
If [Skip] is selected, a message prompting the user to
update the version will appear every time the host machine
is started.In the service mode (Level 2) shown below, it is
possible to set not to display the message.
COPIER > Option > FNC-SW > VER-CHNG
5. Press the counter check key on the Control Panel.
6. Check Device Configuration > Option
Check that the name < Multi Function Professional
Puncher-A1 > is displayed.
7. Check the operation such as paper feed.
8. Check that punching operation is per
formedproperly.
1. Installation
17
閲 FT2-0208-030_20160510.pdf 17
2016/05/10 14:39:52