List of Work for Scheduled Servicing
PR: Replacement (Periodically replaced parts) / CR: Replacement (consumable parts) / CL: Cleaning / LU: Lubrication / AD:
Adjustment / CH: Maintenance
No.
Part Name
Part Num-
ber
Q'ty
Interval
Counter
Reference
Remarks
1
Stapler Unit
FM1-N381
1
CR/500,000
times
DRBL-2 >FIN-
STPR
“Removing the Stapler Unit” on
2
Staple-free Sta-
ple Unit
FM2-B760
1
CR/30,000
times
DRBL-2 >FR-
STPL
“Removing the Staple-free Sta-
3
Paper Retainer
-
-
CL/As nee-
ded
-
-
Cleaning with wet and
tightly wrung lint-free
paper
4
Paddle
-
-
CL/As nee-
ded
-
-
5
Delivery Roller
-
-
CL/As nee-
ded
-
-
6
Return Belt
-
-
CL/As nee-
ded
-
-
7
Inlet Roller
-
-
CL/As nee-
ded
-
-
[1]
[2]
[3]
[4]
[5]
[6]
[7]
3. Periodical Service
40
Содержание Inner Finisher-L1
Страница 11: ...Product Overview 1 Features 5 Specifications 6 Name of Parts 9 ...
Страница 46: ...Periodical Service 3 List of Work for Scheduled Servicing 40 ...
Страница 58: ...1x 1x 1 2 5 Remove the Interface Cover 1 2 Claws 2 1 2 4 Parts Replacement and Cleaning 51 ...
Страница 75: ...1x 1 13 Disconnect the 2 Connectors 1 2 Wire Saddles 2 2x 2x 1 1 2 2 4 Parts Replacement and Cleaning 68 ...
Страница 102: ...8 Remove the Return Belt Unit 1 1 Clip 2 1 Bushing 3 3 2 1 4 Parts Replacement and Cleaning 95 ...
Страница 103: ...Adjustment 5 Overview 97 Basic Adjustment 100 Adjustment when Replacing the Parts 113 Service Label 114 ...
Страница 122: ...Troubleshooting 6 Making Initial Checks 116 Processing Tray Area 117 ...
Страница 126: ...APPENDICES Service Tools 120 General Circuit Diagram 121 ...