2. When installing the Stack Tray, check that the 2
Claws [2] and 2 Hooks [3] of the Stack Tray [1] is
properly installed. If the installation fails, error;
E540-8001/8002 may occur at power ON.
[1]
[3]
[2]
[3]
[2]
[3]
[2]
Removing the Tray Guide
Cover
■ Preparation
1. Remove this machine from the host machine.
“Removing this Machine” on page 44
2. Remove the Front Cover Unit.
3. Remove the Rear Cover.
4. Remove the Delivery Tray.
5. Remove the Upper Feed Guide.
Upper Feed Guide Unit” on page 55
■ Procedure
1. Remove the Upper Stay [1].
• 2 Screws [2]
[1]
[2]
2x
2. Move the Front Alignment Plate [1] and Rear
Alignment Plate [2] to the slit [3] of the Tray Guide
Cover.
[1]
[2]
[3]
[3]
3. Release the latch [1] and move the Front/Rear Tray
Plate [2] to the bottom.
[1]
[2]
[2]
4. Remove the Tray Guide Cover [1].
• 2 Screws [2]
• 2 Claws [3]
4. Parts Replacement and Cleaning
53
Содержание Inner Finisher-K1
Страница 1: ...Revision 3 0 Inner Finisher K1 Service Manual ...
Страница 10: ...Product Overview 1 Features 5 Specifications 6 Name of Parts 9 ...
Страница 23: ...PS1 M1 Paddle M10 Inlet Roller Delivery Roller Processing Tray Unit M1 Paddle Unit 2 Technical Explanation 17 ...
Страница 40: ...Related error code E516 0001 Paddle motor error E516 0002 Paddle motor error 2 Technical Explanation 34 ...
Страница 47: ...Periodical Service 3 Periodic Servicing Tasks 42 ...
Страница 74: ...Adjustment 5 Overview 69 Basic Adjustment 71 Adjustment when Replacing the Parts 86 Service Label 87 ...
Страница 94: ...Troubleshooting 6 Making Initial Checks 89 Processing Tray Area 90 ...
Страница 109: ...11 1x 12 7 Installation 103 ...
Страница 112: ...APPENDICES Service Tools 107 General Circuit Diagram 108 ...